Mumbai Authority Selects Contractor for Coastal Road to Eastern Freeway Link
ROADS & HIGHWAYS

Mumbai Authority Selects Contractor for Coastal Road to Eastern Freeway Link

Mumbai Metropolitan Region Development Authority (MMRDA) has approved construction of a 9.23-km-long corridor connecting the Coastal Road with the Eastern Freeway. Larsen & Toubro has been chosen as the contractor for the project, which is estimated to cost ₹77.65 billion. The corridor will significantly reduce travel time between Orange Gate on the Freeway and Marine Drive and connect the Mumbai Trans Harbour Link to Coastal Road and the Freeway. The project includes a 6.51-km underground tunnel and other auxiliary works. An underground tunnel measuring 6.51 km will be part of the corridor. But the project has been envisaged in such a manner that it should not affect the Metro line. 

The project owes its genesis to the frequent traffic congestion which affects vehicular movement at Orange Gate, Mumbai Port Trust and the post office square near PD’Mello Road. This issue will assume larger proportions after the upcoming Mumbai Trans Harbour Sea link (MTHL) connecting JNPT is ready. 

So MMRDA planned construction of the corridor, including a twin-tube underground tunnel, linking Orange Gate to the Coastal Road to ensure a fast and smooth travel from Eastern Freeway to Mantralaya and Marine Drive.                                         
                                      

Mumbai Metropolitan Region Development Authority (MMRDA) has approved construction of a 9.23-km-long corridor connecting the Coastal Road with the Eastern Freeway. Larsen & Toubro has been chosen as the contractor for the project, which is estimated to cost ₹77.65 billion. The corridor will significantly reduce travel time between Orange Gate on the Freeway and Marine Drive and connect the Mumbai Trans Harbour Link to Coastal Road and the Freeway. The project includes a 6.51-km underground tunnel and other auxiliary works. An underground tunnel measuring 6.51 km will be part of the corridor. But the project has been envisaged in such a manner that it should not affect the Metro line. The project owes its genesis to the frequent traffic congestion which affects vehicular movement at Orange Gate, Mumbai Port Trust and the post office square near PD’Mello Road. This issue will assume larger proportions after the upcoming Mumbai Trans Harbour Sea link (MTHL) connecting JNPT is ready. So MMRDA planned construction of the corridor, including a twin-tube underground tunnel, linking Orange Gate to the Coastal Road to ensure a fast and smooth travel from Eastern Freeway to Mantralaya and Marine Drive.                                                                               

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code