Punjab CM Lays Foundation For 37.93 km Dhussi Bundh Link Road
ROADS & HIGHWAYS

Punjab CM Lays Foundation For 37.93 km Dhussi Bundh Link Road

Punjab Chief Minister Bhagwant Mann laid the foundation stone for the 37.93 km Dhussi Bundh link road in Shahkot constituency on Friday, an infrastructure initiative to improve connectivity and provide flood protection in the Sutlej belt.

The project will be constructed at a cost of Rs 618.2 million (mn) and aims to link the Shahkot-Moga-Rampur Road with the Gidderpindi Dhussi Bund. Officials said the route is designed both as a transportation corridor and as a strengthened embankment to reduce flood risk. Construction and alignment details were announced in an official statement accompanying the foundation event.

The new route is expected to benefit thousands of residents across nearly 15 villages by providing daily access and by functioning as a bypass to ease congestion on existing roads. Authorities noted that the road will connect the Shahkot-Moga Road with the Lohian-Makhu Road and the Gidderpindi Dhussi Bund, enhancing regional mobility. The design places the carriageway along the river bank to integrate flood defences with surface transport infrastructure. Project planners anticipate that the reinforced embankment will offer more reliable protection during high river flows.

The Chief Minister said residents of the Shahkot and Lohian regions had long faced flood threats and that previous administrations had not delivered a lasting solution. He described the project as a permanent answer to recurring inundation problems after witnessing villages become inaccessible in heavy rains. Officials estimated that between 15,000 and 16,000 people from roughly 15 villages would use the link on a daily basis once it is open. The route is also intended to reduce travel times for local commuters and to provide alternate circulation during peak periods.

Local authorities highlighted benefits during the monsoon season, with easier movement for farmers, school buses and residents and fewer disruptions to agricultural activity. The project is presented as a means to stimulate economic activity and to strengthen local infrastructure while improving resilience against flood events. Officials characterised the initiative as an investment in safety, connectivity and regional development with the potential to raise quality of life for affected communities.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Punjab Chief Minister Bhagwant Mann laid the foundation stone for the 37.93 km Dhussi Bundh link road in Shahkot constituency on Friday, an infrastructure initiative to improve connectivity and provide flood protection in the Sutlej belt. The project will be constructed at a cost of Rs 618.2 million (mn) and aims to link the Shahkot-Moga-Rampur Road with the Gidderpindi Dhussi Bund. Officials said the route is designed both as a transportation corridor and as a strengthened embankment to reduce flood risk. Construction and alignment details were announced in an official statement accompanying the foundation event. The new route is expected to benefit thousands of residents across nearly 15 villages by providing daily access and by functioning as a bypass to ease congestion on existing roads. Authorities noted that the road will connect the Shahkot-Moga Road with the Lohian-Makhu Road and the Gidderpindi Dhussi Bund, enhancing regional mobility. The design places the carriageway along the river bank to integrate flood defences with surface transport infrastructure. Project planners anticipate that the reinforced embankment will offer more reliable protection during high river flows. The Chief Minister said residents of the Shahkot and Lohian regions had long faced flood threats and that previous administrations had not delivered a lasting solution. He described the project as a permanent answer to recurring inundation problems after witnessing villages become inaccessible in heavy rains. Officials estimated that between 15,000 and 16,000 people from roughly 15 villages would use the link on a daily basis once it is open. The route is also intended to reduce travel times for local commuters and to provide alternate circulation during peak periods. Local authorities highlighted benefits during the monsoon season, with easier movement for farmers, school buses and residents and fewer disruptions to agricultural activity. The project is presented as a means to stimulate economic activity and to strengthen local infrastructure while improving resilience against flood events. Officials characterised the initiative as an investment in safety, connectivity and regional development with the potential to raise quality of life for affected communities.

Next Story
Real Estate

ANDPL launches AI assistant for Dharavi residents

Adani Navbharat Developers (ANDPL), the special purpose vehicle implementing the Dharavi Redevelopment Project (DRP), has launched Dharavi Didi, a 24x7 AI-powered digital assistant to provide residents with official information on the redevelopment programme.Accessible through video calls, voice calls and WhatsApp, the platform enables residents to obtain information on surveys, eligibility, documentation, rehabilitation and project updates in Hindi, Marathi and English. Support for Tamil, Telugu and Gujarati is planned in the coming months.According to ANDPL, the initiative is intended to imp..

Next Story
Infrastructure Urban

Indobell Secures Domestic Order For Nodulated Wool

Indobell Insulations Limited (Indobell) has disclosed that it has secured a domestic order from Sundaram Brake Linings Limited (Sundaram Brake Linings) for the supply of nodulated wool valued at Rs 48.74 mn. The company submitted the disclosure to BSE Limited on 17 July 2026 under Regulation 30 of the SEBI Listing Obligations and Disclosure Requirements Regulations, 2015 and related circulars. The filing identified the purchaser as a domestic entity and described the contract as a standard supply agreement to be fulfilled over a specified timeline. The order carries payment terms of 45 days by..

Next Story
Infrastructure Urban

PTC Secures BrahMos Order For Strategic Missile Subsystem

PTC Industries Limited has received a landmark order from BrahMos Aerospace Private Limited for development, integration and supply of a strategic missile sub-system for the BrahMos programme. The order marks the company’s first major assignment in systems-level integration and represents a strategic move further downstream in the aerospace and defence value chain. The award reflects BrahMos Aerospace's confidence in PTC’s engineering depth, manufacturing discipline, quality systems and execution capability. The development opens a new chapter as PTC transitions from supplying critical mat..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement