DMRC to prepare DPR for Odisha metro rail project
RAILWAYS & METRO RAIL

DMRC to prepare DPR for Odisha metro rail project

Odisha appears to have begun the massive and ambitious metro rail project. The Delhi Metro Rail Corporation (DMRC) has been tasked with creating a detailed project report (DPR) in this regard.

A Master plan' will also be created for the metro network that includes Bhubaneswar, Khordha, Cuttack, and Puri. The authorities have accepted the challenge, despite the fact that creating the DPR in a short amount of time will be an enormous undertaking while keeping in mind the standards set by the world's best METRO systems.

The DPR would be ready for the route from Biju Patnaik International Airport to Trishulia in the first phase. The Master Canteen, Vani Vihar, Jaydev Vihar, Chandrasekharpur, Patia, Raghunathpur, and Nandankanan to Trishulia localities would all be covered by the metro rail project.

Odisha Rail Infrastructure Development Ltd. (ORIDL), a joint venture between the Government of Odisha and the Ministry of Railways, will be in charge of overseeing the entire metro rail project. The choices were made during a high-level meeting presided over by Balwant Singh, vice-chairman of the Bhubaneswar Development Authority (BDA).

On a number of topics, including metro alignment, the reasonable requirement for multi-agency integration, and others, a thorough presentation was presented.

See also:
Odisha Govt Sanctions Rs 300 Cr For Khurda Road-Balangir Rly Project
Patna Metro Rail Construction receives INR 55210 million


Odisha appears to have begun the massive and ambitious metro rail project. The Delhi Metro Rail Corporation (DMRC) has been tasked with creating a detailed project report (DPR) in this regard. A Master plan' will also be created for the metro network that includes Bhubaneswar, Khordha, Cuttack, and Puri. The authorities have accepted the challenge, despite the fact that creating the DPR in a short amount of time will be an enormous undertaking while keeping in mind the standards set by the world's best METRO systems. The DPR would be ready for the route from Biju Patnaik International Airport to Trishulia in the first phase. The Master Canteen, Vani Vihar, Jaydev Vihar, Chandrasekharpur, Patia, Raghunathpur, and Nandankanan to Trishulia localities would all be covered by the metro rail project. Odisha Rail Infrastructure Development Ltd. (ORIDL), a joint venture between the Government of Odisha and the Ministry of Railways, will be in charge of overseeing the entire metro rail project. The choices were made during a high-level meeting presided over by Balwant Singh, vice-chairman of the Bhubaneswar Development Authority (BDA). On a number of topics, including metro alignment, the reasonable requirement for multi-agency integration, and others, a thorough presentation was presented. See also: Odisha Govt Sanctions Rs 300 Cr For Khurda Road-Balangir Rly ProjectPatna Metro Rail Construction receives INR 55210 million

Next Story
Infrastructure Urban

Concord Control Systems Limited Reports ~85% YoY Growth in H1 FY26

Concord Control Systems Limited (BSE: CNCRD | 543619), India’s leading manufacturer of embedded electronic systems and critical electronic solutions, announced its unaudited financial results for the half year ended September 30, 2025.Financial Highlights – H1 FY26 (YoY Comparison)Revenue from Operations rose to ₹815.45 million, up from ₹497.53 million in H1 FY25, marking a 63.90% year-on-year growth.EBITDA increased to ₹217.34 million, compared to ₹142 million in the same period last year.EBITDA Margin stood at 26.65%, compared to 28.54% in H1 FY25, with the decline attributed to ..

Next Story
Infrastructure Urban

Gateway Distriparks Announces Q2 FY25 Results

Gateway Distriparks Limited (GDL), one of India’s leading multimodal logistics providers, announced its financial results for the quarter ended 30 September 2025.For Q2, the company reported total revenue of INR 154.8 crore (H1: INR 316.9 crore), EBITDA of INR 20.56 crore (H1: INR 45.65 crore), PBT of INR –4.23 crore (H1: INR –0.28 crore), and PAT of INR –2.91 crore (H1: INR –0.37 crore). The company stated that these numbers reflect the consolidation of accounts following Snowman Logistics transitioning from an associate company to a subsidiary in December 2024.Commenting on the per..

Next Story
Infrastructure Transport

Last-Mile Connectivity a Prime Focus, Says Ms. Ashwini Bhide,

The IMC Chamber of Commerce and Industry (IMC) hosted a high-impact Managing Committee session today on the theme “Mumbai Metro: Transforming Connectivity and Commuting.” The session featured an insightful address by Ms. Ashwini Bhide, Managing Director, Mumbai Metro Rail Corporation Ltd. (MMRCL), who shared updates on key transport infrastructure developments across Mumbai and the MMR region.Emphasising the city’s critical economic role, Ms. Bhide noted, “Mumbai is the economic powerhouse of Maharashtra, with more than 95% of the region’s population living in urban areas. As Maharas..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement