Indian Railways Uses Covered Wagons for Bulk Onion Transport
RAILWAYS & METRO RAIL

Indian Railways Uses Covered Wagons for Bulk Onion Transport

Indian Railways continues to utilise covered wagons for the bulk transportation of onions, with 271 onion rakes loaded during the 2023-24 fiscal year. However, the Ministry of Consumer Affairs, Food & Public Distribution has not made any requests for deploying refrigerated wagons for onion transportation.

To support the movement of temperature-sensitive cargo, including fruits and vegetables, Indian Railways provides rail-based refrigerated container services through Container Corporation of India (CONCOR). In 2023-24, a total of 27,771 refrigerated containers were transported via rail.

Additionally, CONCOR has developed temperature-controlled storage facilities at Nashik, New Azadpur, Dadri, and Sonipat, with a total investment of approximately Rs 1.29 billion.

This information was provided by Union Minister of Railways, Information & Broadcasting, and Electronics & Information Technology, Shri Ashwini Vaishnaw, in a written reply to the Rajya Sabha.

(PIB)
              

Your next big infra connection is waiting at RAHSTA 2025 – Asia’s Biggest Roads & Highways Expo, Jio World Convention Centre, Mumbai. Don’t miss out!

Indian Railways continues to utilise covered wagons for the bulk transportation of onions, with 271 onion rakes loaded during the 2023-24 fiscal year. However, the Ministry of Consumer Affairs, Food & Public Distribution has not made any requests for deploying refrigerated wagons for onion transportation.To support the movement of temperature-sensitive cargo, including fruits and vegetables, Indian Railways provides rail-based refrigerated container services through Container Corporation of India (CONCOR). In 2023-24, a total of 27,771 refrigerated containers were transported via rail.Additionally, CONCOR has developed temperature-controlled storage facilities at Nashik, New Azadpur, Dadri, and Sonipat, with a total investment of approximately Rs 1.29 billion.This information was provided by Union Minister of Railways, Information & Broadcasting, and Electronics & Information Technology, Shri Ashwini Vaishnaw, in a written reply to the Rajya Sabha.(PIB)              

Next Story
Infrastructure Transport

Saibaba Colony Flyover Work Resumes After 8-Month Delay

After months of prolonged delays, the National Highways (NH) wing of the State Highways Department has finally commenced foundation work for the last remaining pillar of the long-stalled Saibaba Colony flyover project in Coimbatore.The 975-metre-long flyover, which connects Alagesan Road to the MTP Road Bus Terminus near Eru Company, is being developed at a cost of Rs 520 million. However, construction came to a standstill in December last year when workers accidentally damaged an underground drainage (UGD) pipeline.For nearly eight months, the site remained waterlogged with stagnant sewage, a..

Next Story
Infrastructure Urban

Nagaland Assembly Debates PAP, Border and Road Projects

The Nagaland Legislative Assembly, in its session on 2 September, discussed several crucial issues including the reimposition of the Protected Area Permit (PAP) in the state and the status of road development works under the Pradhan Mantri Gram Sadak Yojana (PMGSY).Responding to a starred question from MLA Achumbemo Kikon, Deputy Chief Minister and Home Minister Y. Patton informed the House that the Ministry of Home Affairs had reinstated the PAP requirement in Nagaland, Manipur, and Mizoram effective 17 December 2024, citing security concerns in border regions. He clarified that no fencing ex..

Next Story
Infrastructure Transport

LDA to Widen Road Linking Kanpur Road and Anant Nagar

The Lucknow Development Authority (LDA) will undertake a major road widening project to improve connectivity between Kanpur Road and the Anant Nagar housing scheme, with an estimated investment of Rs 350 million. The initiative also includes the construction of road dividers, RCC drains, and a trench to support better traffic flow and drainage.During a site inspection on Wednesday, LDA Vice-Chairman Prathamesh Kumar instructed officials to expedite the project once no-objection certificates (NOCs) are obtained from the Uttar Pradesh State Industrial Development Authority (UPSIDC) and the Publi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?