KMRL trials phase 1-B extension from SN Junction to Tripunithura
RAILWAYS & METRO RAIL

KMRL trials phase 1-B extension from SN Junction to Tripunithura

Kochi Metro Rail (KMRL) has successfully conducted a trial run for the Phase 1-B extension from SN Junction to Tripunithura. The trial marks a crucial step in the expansion of Kochi's metro network, bringing enhanced connectivity to more areas within the city.

The Phase 1-B extension, spanning from SN Junction to Tripunithura, is a significant addition to Kochi's metro infrastructure. The trial run signifies the successful integration of the new stretch into the existing metro network, ensuring seamless operations and safety compliance.

The expansion aligns with Kochi's vision for a comprehensive and accessible metro system, offering residents and commuters an efficient and sustainable mode of transportation. The trial run is a pivotal prelude to the official inauguration of the extended metro route, showcasing the commitment of KMRL to expanding the city's public transit network.

As Kochi continues to evolve as a smart city, the metro's phased expansions play a crucial role in addressing the growing transportation needs of the populace. The successful trial run not only validates the technical readiness of the new metro stretch but also heralds a new era of enhanced connectivity and accessibility for the residents of Kochi.

Kochi Metro Rail (KMRL) has successfully conducted a trial run for the Phase 1-B extension from SN Junction to Tripunithura. The trial marks a crucial step in the expansion of Kochi's metro network, bringing enhanced connectivity to more areas within the city. The Phase 1-B extension, spanning from SN Junction to Tripunithura, is a significant addition to Kochi's metro infrastructure. The trial run signifies the successful integration of the new stretch into the existing metro network, ensuring seamless operations and safety compliance. The expansion aligns with Kochi's vision for a comprehensive and accessible metro system, offering residents and commuters an efficient and sustainable mode of transportation. The trial run is a pivotal prelude to the official inauguration of the extended metro route, showcasing the commitment of KMRL to expanding the city's public transit network. As Kochi continues to evolve as a smart city, the metro's phased expansions play a crucial role in addressing the growing transportation needs of the populace. The successful trial run not only validates the technical readiness of the new metro stretch but also heralds a new era of enhanced connectivity and accessibility for the residents of Kochi.

Next Story
Technology

Building Faster, Smarter, and Greener!

Backed by ULCCS’s century-old legacy, U-Sphere combines technology, modular design and sustainable practices to deliver faster and more efficient projects. In an interaction with CW, Rohit Prabhakar, Director - Business Development, shares how the company’s integrated model of ‘Speed-Build’, ‘Smart-Build’ and ‘Sustain-Build’ is redefining construction efficiency, quality and environmental responsibility in India.U-Sphere positions itself at the intersection of speed, sustainability and smart design. How does this translate into measurable efficiency on the ground?At U..

Next Story
Infrastructure Transport

Smart Roads, Smarter India

India’s infrastructure boom is not only about laying more kilometres of highways – it’s about building them smarter, safer and more sustainably. From drones mapping fragile Himalayan slopes to 3D machine-controlled graders reducing human error, technology is steadily reshaping the way projects are planned and executed. Yet, the journey towards digitisation remains complex, demanding not just capital but also coordination, training and vision.Until recently, engineers largely depended on Survey of India toposheets and traditional survey methods like total stations or DGPS to prepare detai..

Next Story
Real Estate

What Does DCPR 2034 Mean?

The Maharashtra government has eased approval norms for high-rise buildings under DCPR 2034, enabling the municipal commissioner to sanction projects up to 180 m on large plots. This change is expected to streamline approvals, reduce procedural delays and accelerate redevelopment, drawing reactions from developers, planners and industry experts about its implications for Mumbai’s vertical growth.Under the revised DCPR 2034 rules, buildings on plots of 2,000 sq m or more can now be approved up to 180 m by the municipal commissioner, provided structural and geotechnical reports are certified b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?