RCF Kapurthala to Roll Out 19 Coach LHB Rake for Bangladesh
RAILWAYS & METRO RAIL

RCF Kapurthala to Roll Out 19 Coach LHB Rake for Bangladesh

Punjab’s Rail Coach Factory (RCF) at Kapurthala will roll out its first 19-coach Linke Hofmann Busch (LHB) rake for Bangladesh Railway on August 12, the Ministry of Railways said. The coaches were built at RCF under an order placed with RITES in 2024 for 200 broad-gauge (BG) passenger coaches in seven variants. The LHB design is noted for higher safety standards, lower maintenance and improved operational efficiency.

The 19-coach rake comprises three AC sleeper cars, three AC chair cars, 11 non-AC chair cars and two power cars. Several design modifications have been introduced, some for the first time in LHB-type coaches, to suit Bangladesh Railway operating conditions. The coaches feature reclining seats with stainless steel armrests and footrests and seats are adjustable to multiple reclining positions for passenger comfort.

Passenger-centric fittings include fans in air conditioned coaches, an integrated CCTV surveillance system, a passenger alarm system, partially openable windows, a baby care room and a prayer room. Considering instances of rooftop travel during peak periods, the roof structure has been strengthened to withstand additional loading from passengers on the roof. These changes follow operational consultations to align with local requirements.

The car body shell has been redesigned to comply with the European Standard EN 15227 and to improve crashworthiness by better absorbing collision impacts. The electrical system has been adapted to operate at 415 V rather than the conventional 750 V system used in Indian Railways coaches, reflecting compatibility needs of Bangladesh Railway. Power systems and control wiring have been tailored accordingly.

Bangladesh informed Parliament that 200 BG passenger coaches will be inducted between June 2026 and December 2027 as part of the agreement. RITES has previously supplied 120 BG LHB passenger coaches, 36 BG locomotives and ten metre gauge locomotives to Bangladesh Railway and has collaborated on multiple infrastructure projects. RITES leadership indicated production will increase after delivery of the first rake, with at least three to four rakes expected during the current financial year.

Punjab’s Rail Coach Factory (RCF) at Kapurthala will roll out its first 19-coach Linke Hofmann Busch (LHB) rake for Bangladesh Railway on August 12, the Ministry of Railways said. The coaches were built at RCF under an order placed with RITES in 2024 for 200 broad-gauge (BG) passenger coaches in seven variants. The LHB design is noted for higher safety standards, lower maintenance and improved operational efficiency. The 19-coach rake comprises three AC sleeper cars, three AC chair cars, 11 non-AC chair cars and two power cars. Several design modifications have been introduced, some for the first time in LHB-type coaches, to suit Bangladesh Railway operating conditions. The coaches feature reclining seats with stainless steel armrests and footrests and seats are adjustable to multiple reclining positions for passenger comfort. Passenger-centric fittings include fans in air conditioned coaches, an integrated CCTV surveillance system, a passenger alarm system, partially openable windows, a baby care room and a prayer room. Considering instances of rooftop travel during peak periods, the roof structure has been strengthened to withstand additional loading from passengers on the roof. These changes follow operational consultations to align with local requirements. The car body shell has been redesigned to comply with the European Standard EN 15227 and to improve crashworthiness by better absorbing collision impacts. The electrical system has been adapted to operate at 415 V rather than the conventional 750 V system used in Indian Railways coaches, reflecting compatibility needs of Bangladesh Railway. Power systems and control wiring have been tailored accordingly. Bangladesh informed Parliament that 200 BG passenger coaches will be inducted between June 2026 and December 2027 as part of the agreement. RITES has previously supplied 120 BG LHB passenger coaches, 36 BG locomotives and ten metre gauge locomotives to Bangladesh Railway and has collaborated on multiple infrastructure projects. RITES leadership indicated production will increase after delivery of the first rake, with at least three to four rakes expected during the current financial year.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code