RITES invites bids for Package-2 of railway project in Talcher
RAILWAYS & METRO RAIL

RITES invites bids for Package-2 of railway project in Talcher

Tenders are invited through E-Tendering system by RITES Ltd., a Public Sector Enterprise under the Ministry of Railways, for the work of “Earthwork In Formation In Embankment & Cutting, Construction Of Major & Minor Bridges, P-Way Works, Supply Of Cement, Structural & Reinforcement Steel, Etc For New Railway Siding For Talcher Fertilizers Limited, Talcher, Odisha_(Package-2).”

Brief Scope of Work:

The earthwork in cutting (max 2.0 m depth) & filling (max 8m height) in formation, supplying & laying of Geotextiles, etc. are to be done for proposed railway track.

Construction of Major bridge: 01 No. (24.4M Composite Girder). Construction of Minor bridges: 10 Nos.

P-Way works (including supply of PSC Sleepers, ballast & fittings and laying of track) to be carried out.

The tender seeks Civil Works worth Rs. 120,87,41,444.00 cr. to be completed in 365 days. As per the tender, the bid validity will be 75 days, and it will be an open bidding process. The bid submission will start on July 24, 2023 and will end on August 1, 2023.

The Tender should be accompanied by earnest money of Rs. 1,00,00,000.00 (One Crore only)

A complete tender document can be downloaded from the official website:
https://etenders.gov.in/eprocure/app

The Employer will open all the Tenders received, in the presence of the Tenderers or their representatives who choose to attend at 15:00 Hrs. on 01.08.2023 in the office of Project Unit Head, RITES Ltd., ECRPO, Project Unit- Bhubaneswar, Unit No. 1122-1132, 11th Floor, DLF Cyber City, Infocity Road, Chandaka Industrial Estate, Patia, Bhubaneswar-751024, Odisha.

Essential details:

Project Estimated Value: ₹ 120,87,41,444.00
Product Category: Civil works
Bid Validity (Days): 75
Period of Work: 365 days
Tender ID: 2023_RITES_160572_1
Tender Ref. No.: RITES/BBS/TFL/Talcher/OT_07
Payment mode: Offline
Form of contract: Percentage

Tenders are invited through E-Tendering system by RITES Ltd., a Public Sector Enterprise under the Ministry of Railways, for the work of “Earthwork In Formation In Embankment & Cutting, Construction Of Major & Minor Bridges, P-Way Works, Supply Of Cement, Structural & Reinforcement Steel, Etc For New Railway Siding For Talcher Fertilizers Limited, Talcher, Odisha_(Package-2).” Brief Scope of Work: The earthwork in cutting (max 2.0 m depth) & filling (max 8m height) in formation, supplying & laying of Geotextiles, etc. are to be done for proposed railway track. Construction of Major bridge: 01 No. (24.4M Composite Girder). Construction of Minor bridges: 10 Nos. P-Way works (including supply of PSC Sleepers, ballast & fittings and laying of track) to be carried out. The tender seeks Civil Works worth Rs. 120,87,41,444.00 cr. to be completed in 365 days. As per the tender, the bid validity will be 75 days, and it will be an open bidding process. The bid submission will start on July 24, 2023 and will end on August 1, 2023. The Tender should be accompanied by earnest money of Rs. 1,00,00,000.00 (One Crore only) A complete tender document can be downloaded from the official website: https://etenders.gov.in/eprocure/app The Employer will open all the Tenders received, in the presence of the Tenderers or their representatives who choose to attend at 15:00 Hrs. on 01.08.2023 in the office of Project Unit Head, RITES Ltd., ECRPO, Project Unit- Bhubaneswar, Unit No. 1122-1132, 11th Floor, DLF Cyber City, Infocity Road, Chandaka Industrial Estate, Patia, Bhubaneswar-751024, Odisha. Essential details: Project Estimated Value: ₹ 120,87,41,444.00 Product Category: Civil works Bid Validity (Days): 75 Period of Work: 365 days Tender ID: 2023_RITES_160572_1 Tender Ref. No.: RITES/BBS/TFL/Talcher/OT_07 Payment mode: Offline Form of contract: Percentage

Next Story
Technology

Building Faster, Smarter, and Greener!

Backed by ULCCS’s century-old legacy, U-Sphere combines technology, modular design and sustainable practices to deliver faster and more efficient projects. In an interaction with CW, Rohit Prabhakar, Director - Business Development, shares how the company’s integrated model of ‘Speed-Build’, ‘Smart-Build’ and ‘Sustain-Build’ is redefining construction efficiency, quality and environmental responsibility in India.U-Sphere positions itself at the intersection of speed, sustainability and smart design. How does this translate into measurable efficiency on the ground?At U..

Next Story
Infrastructure Transport

Smart Roads, Smarter India

India’s infrastructure boom is not only about laying more kilometres of highways – it’s about building them smarter, safer and more sustainably. From drones mapping fragile Himalayan slopes to 3D machine-controlled graders reducing human error, technology is steadily reshaping the way projects are planned and executed. Yet, the journey towards digitisation remains complex, demanding not just capital but also coordination, training and vision.Until recently, engineers largely depended on Survey of India toposheets and traditional survey methods like total stations or DGPS to prepare detai..

Next Story
Real Estate

What Does DCPR 2034 Mean?

The Maharashtra government has eased approval norms for high-rise buildings under DCPR 2034, enabling the municipal commissioner to sanction projects up to 180 m on large plots. This change is expected to streamline approvals, reduce procedural delays and accelerate redevelopment, drawing reactions from developers, planners and industry experts about its implications for Mumbai’s vertical growth.Under the revised DCPR 2034 rules, buildings on plots of 2,000 sq m or more can now be approved up to 180 m by the municipal commissioner, provided structural and geotechnical reports are certified b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?