Rithala to Kundli Corridor Secures Rs 13,733.6 Million Tender
RAILWAYS & METRO RAIL

Rithala to Kundli Corridor Secures Rs 13,733.6 Million Tender

The Delhi Metro Rail Corporation (DMRC) has advanced plans for a new metro corridor linking Rithala with Kundli via Narela and Nathupur as part of Phase IV of the network expansion. The 26.46 km line will extend the existing Red Line and pass through Rohini, Bawana and Narela, serving north-west Delhi and adjacent areas of the National Capital Region. The proposal is intended to deepen rapid transit coverage between the national capital and neighbouring Haryana.

DMRC has floated a Rs 13,733.6 million (mn) civil construction tender for a major section of the corridor that covers design and construction of the metro viaduct, ramps, sidings and the connection to the depot. The package specifies construction of 11 stations along the Narela–Kundli stretch from Narela Sector G-8 to Nathupur and covers civil works between 11.299 km and 26.705 km of the alignment. Tender documents emphasise viaduct engineering and interface works with the depot connection.

The full corridor is planned at 26.46 km with 21 stations in total and the overall project cost is estimated at Rs 62,300 million (mn). DMRC has signalled a target completion timeframe of approximately four years from award of major contracts, subject to statutory clearances and mobilisation. Key intermediate locations are intended to include multiple Rohini sectors and Bawana industrial pockets.

The extension will provide an additional fixed rail option linking residential neighbourhoods, industrial zones and transport hubs across north-west Delhi and parts of the northern NCR. By offering an alternative to road travel for commuters from Narela, Bawana and Rohini, the corridor is expected to relieve pressure on major roads and support lower vehicle emissions. The new line will add to existing Haryana links at Gurugram, Bahadurgarh and Ballabhgarh.

Station planning lists Rithala, multiple Rohini sectors, Barwala, several Bawana industrial sectors, Narela locations, Kundli and Nathupur as part of the detailed plan. The sequence and final station designs will be confirmed during contract execution and design development.

The Delhi Metro Rail Corporation (DMRC) has advanced plans for a new metro corridor linking Rithala with Kundli via Narela and Nathupur as part of Phase IV of the network expansion. The 26.46 km line will extend the existing Red Line and pass through Rohini, Bawana and Narela, serving north-west Delhi and adjacent areas of the National Capital Region. The proposal is intended to deepen rapid transit coverage between the national capital and neighbouring Haryana. DMRC has floated a Rs 13,733.6 million (mn) civil construction tender for a major section of the corridor that covers design and construction of the metro viaduct, ramps, sidings and the connection to the depot. The package specifies construction of 11 stations along the Narela–Kundli stretch from Narela Sector G-8 to Nathupur and covers civil works between 11.299 km and 26.705 km of the alignment. Tender documents emphasise viaduct engineering and interface works with the depot connection. The full corridor is planned at 26.46 km with 21 stations in total and the overall project cost is estimated at Rs 62,300 million (mn). DMRC has signalled a target completion timeframe of approximately four years from award of major contracts, subject to statutory clearances and mobilisation. Key intermediate locations are intended to include multiple Rohini sectors and Bawana industrial pockets. The extension will provide an additional fixed rail option linking residential neighbourhoods, industrial zones and transport hubs across north-west Delhi and parts of the northern NCR. By offering an alternative to road travel for commuters from Narela, Bawana and Rohini, the corridor is expected to relieve pressure on major roads and support lower vehicle emissions. The new line will add to existing Haryana links at Gurugram, Bahadurgarh and Ballabhgarh. Station planning lists Rithala, multiple Rohini sectors, Barwala, several Bawana industrial sectors, Narela locations, Kundli and Nathupur as part of the detailed plan. The sequence and final station designs will be confirmed during contract execution and design development.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code