+
RRTS Operational control centre to be set up at Duhai depot
RAILWAYS & METRO RAIL

RRTS Operational control centre to be set up at Duhai depot

The 5 RRTS stations in the Priority Section which are Duhai Depot, Guldhar, Sahibabad, Ghaziabad, and Duhai have started taking shape.

This administrative building will have a train simulator room, in which information regarding the operations of the train, systems, and training on dealing in real-time situations will be given to the trainees.

A conference room, library, and lecture hall are being constructed for the trainees and officials.

The building’s basement will also have a cafeteria for entertainment and food services along with a recreation room.

In the RRTS stations in the Priority Section, the Duhai Depot covers an area of 17 km between Sahibabad and Duhai in Ghaziabad. Therefore, Duhai Depot’s functioning is expedited for the upcoming operations.

Laying down the RRTS track along with installing OHE at the Duhai depot is being executed on a priority basis.

The RRTS corridor’s operational control centre will be set up at the Duhai depot. All the administration work of the project would be undertaken via the administrative building.

Additionally, one depot along with a stabling yard for RRTS trains will be established at Modipuram and Jangpura.

The Regional rail train coaches’ interiors which feature computer-centric facilities had been recently revealed at the Duhai depot. The coaches shall be soon delivered to the Duhai depot from Savli, Gujarat. The RRTS trains maintenance and subsequent cleaning facilities will be provided at the Duhai depot.

Image Source

The 5 RRTS stations in the Priority Section which are Duhai Depot, Guldhar, Sahibabad, Ghaziabad, and Duhai have started taking shape. This administrative building will have a train simulator room, in which information regarding the operations of the train, systems, and training on dealing in real-time situations will be given to the trainees. A conference room, library, and lecture hall are being constructed for the trainees and officials. The building’s basement will also have a cafeteria for entertainment and food services along with a recreation room. In the RRTS stations in the Priority Section, the Duhai Depot covers an area of 17 km between Sahibabad and Duhai in Ghaziabad. Therefore, Duhai Depot’s functioning is expedited for the upcoming operations. Laying down the RRTS track along with installing OHE at the Duhai depot is being executed on a priority basis. The RRTS corridor’s operational control centre will be set up at the Duhai depot. All the administration work of the project would be undertaken via the administrative building. Additionally, one depot along with a stabling yard for RRTS trains will be established at Modipuram and Jangpura. The Regional rail train coaches’ interiors which feature computer-centric facilities had been recently revealed at the Duhai depot. The coaches shall be soon delivered to the Duhai depot from Savli, Gujarat. The RRTS trains maintenance and subsequent cleaning facilities will be provided at the Duhai depot. Image Source

Next Story
Technology

Six ways a smarter workflow leads to faster, more accurate bids

In today’s fast-paced civil construction environment, estimators need more than just solid numbers. They need smart, streamlined processes. This article explores six key ways connected workflows can transform the estimated approach, help in minimising risk, move faster, and improve accuracy. By integrating tools, data, and teams, one can produce stronger bids with less rework, fewer surprises, and more confidence. As an estimator, the job goes beyond producing numbers. They are responsible for delivering bids that are fast, accurate, and built to win. In today’s civil construction ind..

Next Story
Real Estate

Experion Launches Women-Only Co-Living Project in Greater Noida

Experion, part of Singapore-based AT Capital Group, has launched its first co-living space under its managed rental housing brand, VLIV, in Greater Noida. The all-women residence features 730 twin-sharing beds with a strong focus on safety, comfort, and well-being. VLIV has committed a $300 million investment to create a structured, service-led rental housing ecosystem in India. The brand aims to scale up to 20,000 beds in the next few years, with a long-term target of 100,000 beds nationwide. “India’s rental housing is fragmented. VLIV is our way of building long-term, dependabl..

Next Story
Infrastructure Urban

Officine Maccaferri Acquires CPT to Bolster Tunnelling Tech

Ambienta’s platform company, Officine Maccaferri S.p.A., has acquired CPT Group, a leading Italian developer of robotic prefabrication systems and digital control technologies for mechanised tunnelling. The move positions Maccaferri as a global player in integrated tunnelling solutions, blending traditional and advanced mechanised systems. Based in Nova Milanese, CPT serves major global contractors across Europe, Southeast Asia, and Australia. The company offers robotic prefabrication (Robofactory), productivity-monitoring software for Tunnel Boring Machines (TBMs), and eco-designed spa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?