South Central Railway Runs Special Trains From Kacheguda To Tiruchanur
RAILWAYS & METRO RAIL

South Central Railway Runs Special Trains From Kacheguda To Tiruchanur

South Central Railway will operate special trains between Kacheguda and Tiruchanur on 23 July and 24 July to clear the passenger rush. The zonal railway has scheduled the services specifically to manage the rise in demand on the corridor during the two days. The operation forms part of routine capacity augmentation measures used by the railways to supplement regular services when patronage increases.

Train number 07787 will run from Kacheguda to Tiruchanur on 23 July and train number 07788 will operate from Tiruchanur to Kacheguda on 24 July. The special services will call at Malkajgiri, Charlapalli, Nalgonda, Miryalaguda, Guntur, Tenali, Ongole, Nellore and Renigunta in both directions. The stopping pattern mirrors that of long distance services on the route and provides connectivity to intermediate towns.

The composition of the special trains will include AC II Tier, AC III Tier, sleeper class and general second class coaches to accommodate different passenger preferences. The mix of reserved and unreserved accommodation reflects standard rake formation practices for supplementary trains on busy sections. Catering and basic onboard facilities will be consistent with those available on comparable express services operated by the zone.

The special services will halt at the listed stations in both directions and are intended to ease pressure on scheduled services while meeting short term travel needs. The deployment of these trains underscores the zone's operational planning to respond to temporary surges in demand and to maintain network fluidity. Travellers using the corridor over the two days can expect additional seating options provided through these supplementary runs.

This supplementary service will assist travellers heading to Tiruchanur and nearby destinations by offering a range of accommodation classes to suit varied budgets. Such measures form part of the zone's standard operational response to episodic demand on busy corridors and help maintain punctuality across the network.

South Central Railway will operate special trains between Kacheguda and Tiruchanur on 23 July and 24 July to clear the passenger rush. The zonal railway has scheduled the services specifically to manage the rise in demand on the corridor during the two days. The operation forms part of routine capacity augmentation measures used by the railways to supplement regular services when patronage increases. Train number 07787 will run from Kacheguda to Tiruchanur on 23 July and train number 07788 will operate from Tiruchanur to Kacheguda on 24 July. The special services will call at Malkajgiri, Charlapalli, Nalgonda, Miryalaguda, Guntur, Tenali, Ongole, Nellore and Renigunta in both directions. The stopping pattern mirrors that of long distance services on the route and provides connectivity to intermediate towns. The composition of the special trains will include AC II Tier, AC III Tier, sleeper class and general second class coaches to accommodate different passenger preferences. The mix of reserved and unreserved accommodation reflects standard rake formation practices for supplementary trains on busy sections. Catering and basic onboard facilities will be consistent with those available on comparable express services operated by the zone. The special services will halt at the listed stations in both directions and are intended to ease pressure on scheduled services while meeting short term travel needs. The deployment of these trains underscores the zone's operational planning to respond to temporary surges in demand and to maintain network fluidity. Travellers using the corridor over the two days can expect additional seating options provided through these supplementary runs. This supplementary service will assist travellers heading to Tiruchanur and nearby destinations by offering a range of accommodation classes to suit varied budgets. Such measures form part of the zone's standard operational response to episodic demand on busy corridors and help maintain punctuality across the network.

Next Story
Real Estate

We will continue to invest in integrated commercial destinations: Amrita Gupta

Amrita Gupta, Director, Manglam Group and CEO, Manglam Spa and Resorts, speaks on how projects like Westin Jaipur Resort and Sheraton Jaipur are strengthening Manglam Group's integrated real estate and hospitality strategy.Manglam Group has announced a Rs 1,000 crore hospitality expansion in Rajasthan—what strategic vision is driving this next phase of growth?Hospitality has emerged as a defining pillar of Manglam Group’s long-term growth strategy, underpinned by a vision of creating destination-led experiences that transcend conventional hospitality. The genesis of this journey was The We..

Next Story
Infrastructure Energy

Batliboi Wins Rs 520 Mn Contract For Solar Cell Pollution Controls

Batliboi Limited has secured a major contract from SAEL Industries Limited to supply pollution control systems for a new solar cell manufacturing facility at Jewar in Uttar Pradesh. The order instructs Batliboi Limited's EEG Division to design, engineer, supply, install and commission a PEX system to support SAEL Industries Limited's six GW solar cell line. The contract is domestic in origin and was submitted to the stock exchanges under regulatory disclosure requirements. The contract value is Rs 520 mn, reflecting a substantial order for environmental control equipment for the manufacturing ..

Next Story
Infrastructure Urban

Delhi Approves PARIVARTAN Scheme To Replace Old Trucks And Buses

The Delhi government has approved the Programme for Accelerated Renewal and Incentivisation of Vehicle Assets for Reducing Transport Air Pollution and Network Emissions (PARIVARTAN) to cut transport-related emissions in the national capital. The scheme, supported by the Ministry of Road Transport and Highways (MoRTH), will phase out old, polluting trucks and buses and replace them with BS-VI, higher-emission-standard or electric vehicles. The initiative is intended to modernise the commercial vehicle fleet and strengthen the capital's clean transport system. Owners of Light Goods Vehicles that..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement