+
Govt to create sustainable waste management model for Wullar Lake
WATER & WASTE

Govt to create sustainable waste management model for Wullar Lake

The government intends to create a sustainable waste management model for every outlying village of the lake in order to safeguard and preserve the renowned Wular Lake.

Garbage from 33 villages is dumped into Wular Lake without any sort of treatment, endangering the lake's wildlife and plants.

The government has chosen five out of the 33 villages as trial sites for the development of a long-term, scientific waste management approach.

Additionally, the 4.35 sq km of the lake that had become seriously silted up has been restored by WCMA.

The first phase has begun and will be finished by the end of the following year. The boardwalk will have amenities for bird watching, viewpoint points, and bike lanes.

Famed for its fish and water chestnuts, Wular Lake. Around 4000 tonne of chestnut and 5000 tonne of fish are generated from the lake each year.

Also read:
Performance audit vital for civic bodies, says Gadkari
Centre notifies new battery waste management norms


The government intends to create a sustainable waste management model for every outlying village of the lake in order to safeguard and preserve the renowned Wular Lake. Garbage from 33 villages is dumped into Wular Lake without any sort of treatment, endangering the lake's wildlife and plants. The government has chosen five out of the 33 villages as trial sites for the development of a long-term, scientific waste management approach. Additionally, the 4.35 sq km of the lake that had become seriously silted up has been restored by WCMA. The first phase has begun and will be finished by the end of the following year. The boardwalk will have amenities for bird watching, viewpoint points, and bike lanes. Famed for its fish and water chestnuts, Wular Lake. Around 4000 tonne of chestnut and 5000 tonne of fish are generated from the lake each year. Also read: Performance audit vital for civic bodies, says Gadkari Centre notifies new battery waste management norms

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code