Jal Shakti ministry completes construction of 317 check dams
WATER & WASTE

Jal Shakti ministry completes construction of 317 check dams

The Minor Irrigation Department of the Ministry of Jal Shakti has finished the construction of 317 check dams and the renovation of 218 water ponds under the third phase of the Bundelkhand package.

The building of check dams and water-filled ponds has drastically changed the picture of the Bundelkhand region.

The agriculture yield has been enhanced in the region due to the construction of new check dams. Not only this, but the green cover is also rising around the ponds. Water is being made available to farmers for irrigation purposes, and the renovated ponds are quenching the animals' thirst.

These rain harvesting structures and the check dam together have also managed to increase the groundwater table benefitting crop intensification. The Ministry of Jal Shakti is working hard to finish the work of the third phase of the Bundelkhand package.

The Yogi Adityanath government started a campaign for drinking and irrigation water in Bundelkhand. The department has finished the construction of 317 check dams under the scheme against the target of 328. The department has also renovated 218 ponds against the target of 238. While the work on the pending 20 ponds is also being carried out without any delay.

The construction of check dams serves as a lifesaver in drought-prone regions by preventing soil erosion. The problem of drinking water has also reduced along with the irrigation problem with the construction of check dams. Now the government is designing a plan to plant trees around these check dams.

The Yogi government strives to present Bundelkhand as a model before. The renovation work of check dams and ponds is being done at a fast pace in all seven districts of Bundelkhand to reach the goal. The department is also working on a plan to construct more new check dams here.

Image Source

Also read: Bundelkhand Expressway to be inaugurated in second week of June 2022

The Minor Irrigation Department of the Ministry of Jal Shakti has finished the construction of 317 check dams and the renovation of 218 water ponds under the third phase of the Bundelkhand package. The building of check dams and water-filled ponds has drastically changed the picture of the Bundelkhand region. The agriculture yield has been enhanced in the region due to the construction of new check dams. Not only this, but the green cover is also rising around the ponds. Water is being made available to farmers for irrigation purposes, and the renovated ponds are quenching the animals' thirst. These rain harvesting structures and the check dam together have also managed to increase the groundwater table benefitting crop intensification. The Ministry of Jal Shakti is working hard to finish the work of the third phase of the Bundelkhand package. The Yogi Adityanath government started a campaign for drinking and irrigation water in Bundelkhand. The department has finished the construction of 317 check dams under the scheme against the target of 328. The department has also renovated 218 ponds against the target of 238. While the work on the pending 20 ponds is also being carried out without any delay. The construction of check dams serves as a lifesaver in drought-prone regions by preventing soil erosion. The problem of drinking water has also reduced along with the irrigation problem with the construction of check dams. Now the government is designing a plan to plant trees around these check dams. The Yogi government strives to present Bundelkhand as a model before. The renovation work of check dams and ponds is being done at a fast pace in all seven districts of Bundelkhand to reach the goal. The department is also working on a plan to construct more new check dams here. Image Source Also read: Bundelkhand Expressway to be inaugurated in second week of June 2022

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code