SJVN floats BOS bid for 75 MW Bihar solar project
POWER & RENEWABLE ENERGY

SJVN floats BOS bid for 75 MW Bihar solar project

SJVN Green Energy announced that bids were being invited to provide a balance of system package and comprehensive operation and maintenance for a span of three years for a 75 MW grid-connected solar project located in the Jamui district of Bihar. It was noted that the final date for bid submission was August 31, 2023, and the bids would undergo opening procedures on the very same day. As for the bidding document, its cost was set at Rs 5,000. Bidders were also instructed to present an Earnest Money Deposit amounting to Rs 23.5 million.

Also read: 

Taylormade Renewables gets Rs 1.59 bn order from Andhra Pradesh                           

India revamping energy codes for sustainable buildings                              


SJVN Green Energy announced that bids were being invited to provide a balance of system package and comprehensive operation and maintenance for a span of three years for a 75 MW grid-connected solar project located in the Jamui district of Bihar. It was noted that the final date for bid submission was August 31, 2023, and the bids would undergo opening procedures on the very same day. As for the bidding document, its cost was set at Rs 5,000. Bidders were also instructed to present an Earnest Money Deposit amounting to Rs 23.5 million.Also read: Taylormade Renewables gets Rs 1.59 bn order from Andhra Pradesh                           India revamping energy codes for sustainable buildings                              

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram