SJVN issues EPC tender for 75 MW solar project in Bihar
POWER & RENEWABLE ENERGY

SJVN issues EPC tender for 75 MW solar project in Bihar

SJVN Green Energy, a fully owned subsidiary of SJVN, has released a tender for the engineering, procurement, and construction (EPC) of a 75 MW solar project in Banka, Bihar.

Tender details: - Submission deadline: September 10, 2024 - Earnest money deposit: Rs 75 million - Scope of work: Includes design, engineering, supply, erection, testing, and commissioning of the solar project. The successful bidder will also be required to operate and maintain the project for three years.

Eligibility criteria: - Bidders: Must be registered Indian companies. - Experience: Bidders should have experience in designing, supplying, and erecting or supervising the erection and commissioning of a solar photovoltaic (SPV)-based grid-connected project with a cumulative capacity of at least 30 MW. Of this, at least one project should be 10 MW or larger and operational for at least three months. Alternatively, bidders may be developers of SPV-based grid-connected projects totalling 30 MW or higher, with at least one project of 10 MW or larger operational for at least three years. - Project experience: Bidders should have completed an industrial project in sectors such as power, steel, oil and gas, petrochemical, fertilizer, cement, or coal mining, with a minimum project value of Rs 1.14 billion, operational for at least six months. - Financial requirements: Bidders? annual average turnover over the last three financial years, ending March 31, 2024, should be Rs 1.14 billion. The net worth must be positive for the previous financial year and at least two of the three preceding years.

In April, SJVN Green Energy had also invited bids for a 100 MW solar project in the Didwana-Kuchaman district of Rajasthan. (Mercom)

SJVN Green Energy, a fully owned subsidiary of SJVN, has released a tender for the engineering, procurement, and construction (EPC) of a 75 MW solar project in Banka, Bihar. Tender details: - Submission deadline: September 10, 2024 - Earnest money deposit: Rs 75 million - Scope of work: Includes design, engineering, supply, erection, testing, and commissioning of the solar project. The successful bidder will also be required to operate and maintain the project for three years. Eligibility criteria: - Bidders: Must be registered Indian companies. - Experience: Bidders should have experience in designing, supplying, and erecting or supervising the erection and commissioning of a solar photovoltaic (SPV)-based grid-connected project with a cumulative capacity of at least 30 MW. Of this, at least one project should be 10 MW or larger and operational for at least three months. Alternatively, bidders may be developers of SPV-based grid-connected projects totalling 30 MW or higher, with at least one project of 10 MW or larger operational for at least three years. - Project experience: Bidders should have completed an industrial project in sectors such as power, steel, oil and gas, petrochemical, fertilizer, cement, or coal mining, with a minimum project value of Rs 1.14 billion, operational for at least six months. - Financial requirements: Bidders? annual average turnover over the last three financial years, ending March 31, 2024, should be Rs 1.14 billion. The net worth must be positive for the previous financial year and at least two of the three preceding years. In April, SJVN Green Energy had also invited bids for a 100 MW solar project in the Didwana-Kuchaman district of Rajasthan. (Mercom)

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code