Goa tourism department to build 3D Printing Building in Panaji
Real Estate

Goa tourism department to build 3D Printing Building in Panaji

The head office of the Goa Tourism Development Corporation Limited has invited for the development of Tourism Destination at Patto Convention Centre Panaji Regarding Construction of Innovative 3D Printing Building.

The project is being built under the Swadesh Darshan Scheme. The new mini convention centre will have Goa’s largest auditorium with a capacity of 1300 seats. The convention centre structure comprises of lower ground, ground floor, first floor, and second floor with a total built-up area of 13,965 square metre.

This is an open tender and the bidding document is available online for downloading on https://eprocure.goa.gov.in/nicgep/app

The tender seeks construction works worth Rs 7,83,04,584 crore to be completed in 180 days. As per the tender, the bid validity will be 90 days, and it will be an open bidding process. The bid submission period began on May 6, 2023 and will end on May 18, 2023.

Essential details:

Project Estimated Value: ₹ 7,83,04,584
Product Category: Construction works
Bid Validity (Days): 90
Period of Work: 180 days
Tender ID - 2023_GTDCL_8579_1
Tender Ref. No.:GTDC/PC/EE(N)/2023-24/e-06
Payment mode: Online
Form of contract: Item Rate

The head office of the Goa Tourism Development Corporation Limited has invited for the development of Tourism Destination at Patto Convention Centre Panaji Regarding Construction of Innovative 3D Printing Building. The project is being built under the Swadesh Darshan Scheme. The new mini convention centre will have Goa’s largest auditorium with a capacity of 1300 seats. The convention centre structure comprises of lower ground, ground floor, first floor, and second floor with a total built-up area of 13,965 square metre. This is an open tender and the bidding document is available online for downloading on https://eprocure.goa.gov.in/nicgep/app The tender seeks construction works worth Rs 7,83,04,584 crore to be completed in 180 days. As per the tender, the bid validity will be 90 days, and it will be an open bidding process. The bid submission period began on May 6, 2023 and will end on May 18, 2023. Essential details: Project Estimated Value: ₹ 7,83,04,584 Product Category: Construction works Bid Validity (Days): 90 Period of Work: 180 days Tender ID - 2023_GTDCL_8579_1 Tender Ref. No.:GTDC/PC/EE(N)/2023-24/e-06 Payment mode: Online Form of contract: Item Rate

Next Story
Real Estate

CREDAI-MCHI to Host 10th Design & Construction Conference

CREDAI-MCHI will host the 10th anniversary edition of its Design & Construction Conference on August 19, 2026, at the Jio World Convention Centre in Mumbai.The event is expected to bring together more than 500 procurement leaders, construction heads, architects, consultants and senior real estate decision-makers, alongside over 50 construction and ancillary brands.The conference will feature product launches, technology showcases, knowledge sessions, strategic business-to-business networking and recognition of procurement professionals contributing to the transformation of the construction..

Next Story
Infrastructure Energy

BorgWarner Wins Extension for High-Voltage Inverter Programmes

BorgWarner has secured a major extension of several high-volume high-voltage inverter programmes from a leading European automotive manufacturer.The contracts cover updated inverter designs for plug-in hybrid and 800V battery-electric vehicle applications. Production is scheduled to begin in 2029.Isabelle McKenzie, President and General Manager, BorgWarner PowerDrive Systems, said the programme extensions demonstrate the company’s position in power electronics and reflect the strength of its technology, in-house expertise and customer relationships.For plug-in hybrid vehicles, BorgWarner wil..

Next Story
Infrastructure Urban

Castrol India Q2 Profit Rises 43% to Rs 3.48 bn

Castrol India reported a 43 per cent year-on-year increase in profit after tax to Rs 3.48 billion for the quarter ended June 30, 2026, supported by growth across its consumer, industrial and institutional businesses.Revenue from operations increased 25 per cent to Rs 18.71 billion during the second quarter of 2026, compared with Rs 14.97 billion in the corresponding period of 2025. EBITDA rose 41 per cent to Rs 4.94 billion from Rs 3.50 billion.Sequentially, revenue increased from Rs 15.45 billion in the first quarter of 2026, while EBITDA rose from Rs 3.29 billion. Profit after tax increased ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement