M&M Targets 2 lakh EV Production from Chakan Plant by 2029
ECONOMY & POLICY

M&M Targets 2 lakh EV Production from Chakan Plant by 2029

Mahindra & Mahindra (M&M) has projected that its forthcoming plant in Chakan, Maharashtra, will reach its peak production capacity of 2 lakh electric vehicles (EVs) annually between 2027 and 2029. This projection was shared by Veejay Nakra, the company's President of the Automotive Sector. M&M anticipates that by 2030, EVs will constitute 30% of its total volume. Earlier in January, the Maharashtra government approved M&M's proposal to establish a $1 billion electric vehicle facility in Chakan. The investment, channeled through its subsidiary, will span 7-8 years and will focus on the development and production of its upcoming Born Electric (BE) models. The first product from the BE range is slated for market release by the end of next year, with production at the Chakan plant commencing 4-5 months prior.

Currently, M&M's sole electric model in the passenger vehicle segment is the XUV400, produced at its Nashik plant. However, the company dominates the domestic electric three-wheeler market with over a 70% share. Plans are in place to launch five electric SUV models under the XUV and the new electric-only BE brand.

Mahindra & Mahindra (M&M) has projected that its forthcoming plant in Chakan, Maharashtra, will reach its peak production capacity of 2 lakh electric vehicles (EVs) annually between 2027 and 2029. This projection was shared by Veejay Nakra, the company's President of the Automotive Sector. M&M anticipates that by 2030, EVs will constitute 30% of its total volume. Earlier in January, the Maharashtra government approved M&M's proposal to establish a $1 billion electric vehicle facility in Chakan. The investment, channeled through its subsidiary, will span 7-8 years and will focus on the development and production of its upcoming Born Electric (BE) models. The first product from the BE range is slated for market release by the end of next year, with production at the Chakan plant commencing 4-5 months prior. Currently, M&M's sole electric model in the passenger vehicle segment is the XUV400, produced at its Nashik plant. However, the company dominates the domestic electric three-wheeler market with over a 70% share. Plans are in place to launch five electric SUV models under the XUV and the new electric-only BE brand.

Next Story
Infrastructure Urban

J&K Bank Reports H1 Net Profit of Rs 9.79 Bn, Q2 at Rs 4.94 Bn

J&K Bank announced a net profit of Rs 4.94 billion for the July–September quarter (Q2) of the current financial year (CFY), bringing its half-year (H1) net profit to Rs 9.78 billion, up from Rs 9.66 billion in H1 last fiscal. The results were approved by the Bank’s Board of Directors at a meeting held at its Corporate Headquarters.The Q2 performance was moderated by Rs 920 million provisioning towards its investment in Jammu and Kashmir Grameen Bank following the amalgamation of Ellaquai Dehati Bank under the “One State, One RRB” initiative. Total provisioning for H1 stands at Rs 1..

Next Story
Building Material

Tata Steel, Air Water India Ink 20-Year Deal for Jamshedpur ASU

Tata Steel has signed a 20-year agreement with Air Water India Private Limited (AWIPL) to operate and maintain its advanced Air Separation Unit (ASU) in Jamshedpur. The partnership aims to boost Tata Steel’s industrial gas infrastructure and improve efficiency through the use of cutting-edge cryogenic technologies. The agreement was signed between Peeyush Gupta, Vice President (TQM, GSP & SC), Tata Steel, and Kausik Mukhopadhyay, Managing Director, AWIPL. Under the contract, AWIPL will manage operations of the ASU, which can produce 1,800 tonnes of oxygen per day, along with nitrogen, argon..

Next Story
Infrastructure Urban

PM Modi Inaugurates and Lays Foundation for Projects in Andhra Pradesh

Prime Minister Narendra Modi inaugurated and laid the foundation stones for multiple projects worth Rs 134.3 billion in Andhra Pradesh. The initiatives span key sectors including infrastructure, energy, and urban development, aimed at boosting regional growth and job creation.In Visakhapatnam, the Prime Minister dedicated several completed infrastructure projects to the nation, while in Nandyal and West Godavari, he laid foundations for renewable energy and water resource developments. These projects align with the government’s focus on improving connectivity, expanding industrial potential,..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?