Supertech twin tower gets demolished!
Real Estate

Supertech twin tower gets demolished!

A year after the Supreme Court ordered the Supertech twin towers in Noida to be destroyed, the tower was demolished on August 28.

The "waterfall implosion" approach actually brought the nearly 100-metre-high structures—taller than Delhi's famous Qutub Minar (73 m)—to the ground in seconds, in a magnificent display of contemporary engineering.


Source: Dainik Jagran

The surrounding structures seemed secure a short time after the demolition.

In Sector 93A in Noida, which is adjacent to the national capital of Delhi, the Supertech Emerald Court housing society's Apex (32 floors) and Ceyane (29 floors) towers have been under development since 2009. They were India's tallest buildings that have been destroyed.

The building was brought down by an explosion that used about 3,700 kg of explosives.

Also read:
Supertech twin towers to be demolished on August 28
Supertech plans to raise Rs 300 cr to expedite construction in Delhi-NCR
Demolition of Supertech twin towers poses challenges for India


A year after the Supreme Court ordered the Supertech twin towers in Noida to be destroyed, the tower was demolished on August 28. The waterfall implosion approach actually brought the nearly 100-metre-high structures—taller than Delhi's famous Qutub Minar (73 m)—to the ground in seconds, in a magnificent display of contemporary engineering. Source: Dainik Jagran The surrounding structures seemed secure a short time after the demolition. In Sector 93A in Noida, which is adjacent to the national capital of Delhi, the Supertech Emerald Court housing society's Apex (32 floors) and Ceyane (29 floors) towers have been under development since 2009. They were India's tallest buildings that have been destroyed. The building was brought down by an explosion that used about 3,700 kg of explosives. Also read: Supertech twin towers to be demolished on August 28Supertech plans to raise Rs 300 cr to expedite construction in Delhi-NCRDemolition of Supertech twin towers poses challenges for India

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?