HAL to Build Parallel Runway at Nashik Airport
AVIATION & AIRPORTS

HAL to Build Parallel Runway at Nashik Airport

Hindustan Aeronautics Ltd (HAL) is set to construct a parallel runway at Nashik Airport to enhance operational efficiency and accommodate the city's growing aviation needs. The project is estimated to cost Rs 2 billion and is expected to be completed in about two years.

HAL has already appointed a consultant to design the runway and assess technical parameters. A technical survey is underway, analyzing soil conditions and structural feasibility. Once completed, the tendering process for construction will begin, with authorities expecting to release the tender by the end of March.

The new runway will be 3 km long and 45 meters wide, mirroring the existing one. This additional infrastructure will ensure uninterrupted operations, especially during maintenance work on the primary runway. It will also strengthen air connectivity in Nashik.

A HAL official stated, "The new runway will not only boost operational reliability but also support the growing air connectivity in Nashik."

Hindustan Aeronautics Ltd (HAL) is set to construct a parallel runway at Nashik Airport to enhance operational efficiency and accommodate the city's growing aviation needs. The project is estimated to cost Rs 2 billion and is expected to be completed in about two years. HAL has already appointed a consultant to design the runway and assess technical parameters. A technical survey is underway, analyzing soil conditions and structural feasibility. Once completed, the tendering process for construction will begin, with authorities expecting to release the tender by the end of March. The new runway will be 3 km long and 45 meters wide, mirroring the existing one. This additional infrastructure will ensure uninterrupted operations, especially during maintenance work on the primary runway. It will also strengthen air connectivity in Nashik. A HAL official stated, The new runway will not only boost operational reliability but also support the growing air connectivity in Nashik.

Next Story
Products

TOTO India Launches Premium G & L Showers with Sleek Faucet Range

TOTO India has launched its G Shower and L Shower series, alongside an expanded range of GT, LH, and Pull-Out lavatory faucets. The collection blends advanced technology, refined aesthetics, and everyday comfort, staying true to TOTO’s philosophy of creating spaces that are both beautiful and functional. The G Shower series delivers the 3Rs of showering: Relaxing, Refreshing, and Revitalizing. Features include the Calming Shawl spray mode, Warm Spa technology, and multiple overhead and hand-shower options across eight finishes. The L Shower complements this with easy-to-use controls sui..

Next Story
Infrastructure Energy

Hero Future Energies Secures Funding for 120 MW Hybrid Project

Hero Future Energies (HFE), through its SPV Clean Renewable Energy Hybrid Three, has secured Rs 19.08 billion in funding from the State Bank of India (lead) and Canara Bank. The funds will be used to develop and construct HFE’s 120 MW renewable energy hybrid project at Kurnool, Andhra Pradesh. The project, contracted with SJVN, integrates wind, solar, and storage technologies to deliver reliable peak power. With a 21-year repayment period, the funding ensures timely execution and the commencement of commercial operations. The financial closure demonstrates continued lender confidence in..

Next Story
Infrastructure Energy

IOC GPS Renewables Raises Rs 8.36 billion Debt for Compressed Biogas Plants

IOC GPS Renewables Private Limited (IGRPL), a joint venture between IndianOil Corporation  and GPS Renewables, has raised Rs 8.36 billion (approx. US$ 95 million) in debt financing from Indian Bank to execute nine Compressed Biogas (CBG) projects across India.   The funding is the largest single-bank debt raise in the CBG sector and the first fully non-recourse financing in India for these projects. The plants—four in Haryana, three in Uttar Pradesh, one each in Chhattisgarh and Andhra Pradesh—will each produce 15 tonnes of CBG per day using paddy straw as feedstock. All nin..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?