Centre Clears Rs 69.6 Billion Kaziranga Highway Expansion
ROADS & HIGHWAYS

Centre Clears Rs 69.6 Billion Kaziranga Highway Expansion

The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, has approved the widening and improvement of the Kaliabor–Numaligarh section of NH-715 in Assam, including wildlife-friendly measures for the stretch passing through Kaziranga National Park. The 85.7 km project will be developed in Engineering, Procurement and Construction (EPC) mode at a cost of Rs 69.6 billion.
Union Minister of Ports, Shipping & Waterways Sarbananda Sonowal called the approval a historic day for Assam, noting that the project reflects the Prime Minister’s vision of harmonising development with environmental protection. A key feature is the 34.5 km elevated corridor across Kaziranga, ensuring uninterrupted and safe movement of wildlife between the park and Karbi Anglong Hills.
The project will also include 30.2 km of road upgrades and 21 km of greenfield bypasses to decongest Jakhalabandha and Bokakhat. It aims to drastically cut travel time, boost eco-tourism, ease pilgrim and visitor travel, and open new trade and industry opportunities.
Sonowal emphasised that the highway will symbolise growth in harmony with nature, strengthening Assam’s economy while safeguarding its natural heritage. The project is expected to create 15.4 million person-days of direct employment and 19.2 million person-days of indirect employment.
The improved corridor will link with NH-127, NH-129 and SH-35, while connecting three railway stations (Nagaon, Jakhalabandha, Vishwanath Chariali) and three airports (Tezpur, Lilabari, Jorhat), boosting logistics, trade and mobility across the region. 

The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, has approved the widening and improvement of the Kaliabor–Numaligarh section of NH-715 in Assam, including wildlife-friendly measures for the stretch passing through Kaziranga National Park. The 85.7 km project will be developed in Engineering, Procurement and Construction (EPC) mode at a cost of Rs 69.6 billion.Union Minister of Ports, Shipping & Waterways Sarbananda Sonowal called the approval a historic day for Assam, noting that the project reflects the Prime Minister’s vision of harmonising development with environmental protection. A key feature is the 34.5 km elevated corridor across Kaziranga, ensuring uninterrupted and safe movement of wildlife between the park and Karbi Anglong Hills.The project will also include 30.2 km of road upgrades and 21 km of greenfield bypasses to decongest Jakhalabandha and Bokakhat. It aims to drastically cut travel time, boost eco-tourism, ease pilgrim and visitor travel, and open new trade and industry opportunities.Sonowal emphasised that the highway will symbolise growth in harmony with nature, strengthening Assam’s economy while safeguarding its natural heritage. The project is expected to create 15.4 million person-days of direct employment and 19.2 million person-days of indirect employment.The improved corridor will link with NH-127, NH-129 and SH-35, while connecting three railway stations (Nagaon, Jakhalabandha, Vishwanath Chariali) and three airports (Tezpur, Lilabari, Jorhat), boosting logistics, trade and mobility across the region. 

Next Story
Building Material

Shalimar Paints Launches New Durable Luxury Interior and Exterior Range

Shalimar Paints has introduced three additions to its portfolio: Hero Insignia Luxury Interior Emulsion, Superlac PU Gloss Enamel and Hero Weather Guard 12 Luxury Exterior Emulsion. The new range is designed to combine finish, durability and environmental responsibility for modern residential spaces.Hero Insignia is a water-based luxury interior emulsion formulated with hybrid binder technology, providing a silky finish, stain resistance and protection from scuff marks. It offers more than 2,000 colour options, a 10-year promise and zero VOC levels, and can be applied on plaster, concrete and ..

Next Story
Resources

Trimble Promotes Harsh Pareek as VP Direct Sales for APAC

Trimble has promoted Harsh Pareek to Vice President, Direct Sales, Asia-Pacific for its Architecture, Engineering, Construction and Operations (AECO) division. Mr Pareek joined the company in 2017 and has more than 27 years of industry experience. He most recently served as Regional Sales Director for India for over eight years, during which he played a major role in accelerating Trimble’s growth and expanding its footprint across the Indian Subcontinent.Expressing his focus for the new role, Mr Pareek said that the AECO sector in Asia-Pacific is entering a phase driven by technology, sustai..

Next Story
Infrastructure Energy

Rajasthan Moves Mining Processes Fully Online From 15 December

The Rajasthan government will make all mining-related processes entirely paperless from 15 December, a senior official said. The Mines, Geology and Petroleum Department will halt all offline work across its mining modules, requiring officials to operate exclusively through online systems. Principal Secretary (Mines) T Ravikant said compliance monitoring will begin on 1 December while addressing an orientation workshop for officials from the Jaipur, Bharatpur, Ajmer, Kota and Bikaner zones. Ravikant explained that the department has developed two mobile applications and fourteen online modules..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement