+
NHAI Sets Multiple Guinness Records on Andhra Highway
ROADS & HIGHWAYS

NHAI Sets Multiple Guinness Records on Andhra Highway

National Highways Authority of India has recently created multiple Guinness World Records near Puttaparthi, Andhra Pradesh, during construction of the six-lane Bengaluru–Kadapa–Vijayawada Economic Corridor. The records highlight unprecedented speed and scale in bituminous concrete paving on a national highway project.
The first two records were achieved for the longest continuous laying of bituminous concrete, covering 28.89 lane km (a 3-lane-wide, 9.63 km stretch) within 24 hours, and for laying the highest quantity of 10,655 metric tonnes of bituminous concrete in the same duration. These milestones were established for the first time globally on a national highway project.
Building on this achievement, two additional Guinness World Records were set on 11 January 2026. These included the continuous laying of 57,500 metric tonnes of bituminous concrete and paving of 156 lane km (a 3-lane-wide, 52 km stretch), surpassing the earlier global record of 84.4 lane km. The feat was executed across Package-2 and Package-3 of the corridor.
The record-setting work was delivered by NHAI in association with concessionaire Rajpath Infracon Private Limited, using advanced construction equipment including multiple hot mix plants, pavers, rollers and tippers. Quality control and monitoring were supported by premier institutions such as Indian Institute of Technology Bombay, along with OEMs, ensuring strict adherence to safety and quality standards.
Spanning 343 km, the access-controlled corridor features 17 interchanges, 10 wayside amenities, a 5.3 km tunnel and a forest stretch of around 21 km. Once completed, it is expected to reduce travel distance by about 100 km and cut travel time by nearly four hours, significantly improving connectivity between Bengaluru, Vijayawada, the Rayalaseema region and key industrial nodes in Andhra Pradesh.
The Guinness World Records underscore NHAI’s commitment to delivering world-class highway infrastructure aligned with the Government of India’s vision for safe, efficient and globally benchmarked transport corridors that drive economic growth and regional development.    

National Highways Authority of India has recently created multiple Guinness World Records near Puttaparthi, Andhra Pradesh, during construction of the six-lane Bengaluru–Kadapa–Vijayawada Economic Corridor. The records highlight unprecedented speed and scale in bituminous concrete paving on a national highway project.The first two records were achieved for the longest continuous laying of bituminous concrete, covering 28.89 lane km (a 3-lane-wide, 9.63 km stretch) within 24 hours, and for laying the highest quantity of 10,655 metric tonnes of bituminous concrete in the same duration. These milestones were established for the first time globally on a national highway project.Building on this achievement, two additional Guinness World Records were set on 11 January 2026. These included the continuous laying of 57,500 metric tonnes of bituminous concrete and paving of 156 lane km (a 3-lane-wide, 52 km stretch), surpassing the earlier global record of 84.4 lane km. The feat was executed across Package-2 and Package-3 of the corridor.The record-setting work was delivered by NHAI in association with concessionaire Rajpath Infracon Private Limited, using advanced construction equipment including multiple hot mix plants, pavers, rollers and tippers. Quality control and monitoring were supported by premier institutions such as Indian Institute of Technology Bombay, along with OEMs, ensuring strict adherence to safety and quality standards.Spanning 343 km, the access-controlled corridor features 17 interchanges, 10 wayside amenities, a 5.3 km tunnel and a forest stretch of around 21 km. Once completed, it is expected to reduce travel distance by about 100 km and cut travel time by nearly four hours, significantly improving connectivity between Bengaluru, Vijayawada, the Rayalaseema region and key industrial nodes in Andhra Pradesh.The Guinness World Records underscore NHAI’s commitment to delivering world-class highway infrastructure aligned with the Government of India’s vision for safe, efficient and globally benchmarked transport corridors that drive economic growth and regional development.    

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App