Only Roads, No Potholes!
ROADS & HIGHWAYS

Only Roads, No Potholes!

The National Highways Authority of India (NHAI) is now adopting a new technology whereby roads that repair themselves will soon become a reality in the country, enabling asphalt to self-heal and address the issue of potholes, which, incidentally, is also one of the key reasons for road accidents and deaths in the country. This will also increase the lifespan of roads, eliminate the need for road maintenance and reduce the resultant traffic disruptions.

How it works

Asphalt is a mixture of gravel and sand held together by the viscous mixture of bitumen. As roads age, the bitumen faces wear and tear and pieces of the asphalt may erode, causing small cracks that, over time, turn into potholes. Small pieces of steel fibre are mixed into the bitumen; once the asphalt is poured and set, the bitumen can be heated so it will rebind with stones and gravel in the asphalt. In case there is a gap, the bitumen will expand and fill it while the steel threads help patch up the potholes.

To read the full story, CLICK HERE.

The National Highways Authority of India (NHAI) is now adopting a new technology whereby roads that repair themselves will soon become a reality in the country, enabling asphalt to self-heal and address the issue of potholes, which, incidentally, is also one of the key reasons for road accidents and deaths in the country. This will also increase the lifespan of roads, eliminate the need for road maintenance and reduce the resultant traffic disruptions.How it worksAsphalt is a mixture of gravel and sand held together by the viscous mixture of bitumen. As roads age, the bitumen faces wear and tear and pieces of the asphalt may erode, causing small cracks that, over time, turn into potholes. Small pieces of steel fibre are mixed into the bitumen; once the asphalt is poured and set, the bitumen can be heated so it will rebind with stones and gravel in the asphalt. In case there is a gap, the bitumen will expand and fill it while the steel threads help patch up the potholes.To read the full story, CLICK HERE.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Sabarmati Riverfront Two Plots Up for Auction at Rs2.24 bn Base Price

Two commercial plots on the western bank of the Sabarmati Riverfront will be auctioned with a base price of Rs 112 crore each, equivalent to Rs 1.12 bn apiece and Rs 2.24 billion in total. The parcels are located adjacent to the Metro Rail Bridge in Ahmedabad and form the first commercial offering after a prolonged pause. The Riverfront Development Corporation has framed the sale as part of a phased commercial release to revive development along the riverfront. The combined base valuation has been set by the corporation to reflect market rates along the riverfront. The corporation has fixed a ..

Next Story
Infrastructure Urban

Andhra Pradesh to Connect Over One Million Streetlights

Andhra Pradesh will undertake a statewide smart streetlighting programme across all 123 Urban Local Bodies (ULBs), bringing around 1.05 million (mn) streetlights under an AI enabled monitoring and management system. The programme will be implemented by Energy Efficiency Services Limited (EESL) with the Commissioner and Director of Municipal Administration under the state Municipal Administration and Urban Development Department. The project aims to convert conventional streetlighting into a digitally managed municipal service monitored and maintained remotely. The initial phase will cover abou..

Next Story
Infrastructure Urban

AMC To Procure Four Machines For Guard Rail Cleaning

Ahmedabad Municipal Corporation will introduce four specialised machines for cleaning guard railings along major roads and the central verges of BRTS and Metro corridors. The civic body plans to replace manual labour with mechanised cleaning to improve maintenance of road infrastructure and greenery. The purchase is estimated at Rs 82.8 million (mn), excluding GST. The proposal sets the base price of each machine at about Rs 20.7 million (mn) so four units total Rs 82.8 million (mn) before GST. 18 per cent GST will be applicable separately. During the warranty period each machine will operate ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement