Proposed Coastal Link to Connect Kharegaon-Anand Nagar in Kopri, Thane
ROADS & HIGHWAYS

Proposed Coastal Link to Connect Kharegaon-Anand Nagar in Kopri, Thane

The Mumbai Metropolitan Region Development Authority (MMRDA) has begun working on a significant coastal road project in Thane as the coastal road parallel to Ghodbunder Road faces challenges. It aims to enhance connectivity in the area by connecting Kharegaon and Anand Nagar at Kopri.

The plan for the proposed link road between Kharegaon and Anand Nagar at Kopri has been prepared. The feasibility of the project is being assessed as part of the second phase of the Thane coastal road initiative.

At present, there is no direct road connection between Kharegaon and Kopri, resulting in commuters having to take a detour of over 30 minutes. The new coastal road will significantly reduce travel time to approximately 15 to 20 minutes, benefitting the area's residents.

The proposed coastal link road between Kharegaon and Kopri spans a length of 7.34 km. The MMRDA has started the process of appointing a consultant to prepare a feasibility report and proceed accordingly. The consultant will inspect the proposed road alignment, taking into account the potential construction of a bridge to connect both sides of the Thane Creek.

Regarding other projects, the Thane coastal road project connecting Gaimukh and Balkum, estimated to be 13.21 km in length and costing Rs 45 billion, is still in the planning stage. However, it has faced obstacles due to opposition from residents of Mogharpada Village on Ghodbunder Road. The MMRDA intends to acquire the land occupied by the villagers, which is not only necessary for the Thane coastal road but also for establishing a car depot for the Metro 4 and Metro 4A Green Lines—Wadala-Ghatkopar-Kasarvadavali and Kasarvadavali-Gaimukh metro rail corridors.

As the MMRDA makes progress with these infrastructure projects, they are carefully considering how to address challenges and ensure the effective implementation of these vital transportation links in Thane.

Also read:
Government of Maharashtra invites tenders for civil works
IIT-Delhi flags chloride concern for buildings


The Mumbai Metropolitan Region Development Authority (MMRDA) has begun working on a significant coastal road project in Thane as the coastal road parallel to Ghodbunder Road faces challenges. It aims to enhance connectivity in the area by connecting Kharegaon and Anand Nagar at Kopri. The plan for the proposed link road between Kharegaon and Anand Nagar at Kopri has been prepared. The feasibility of the project is being assessed as part of the second phase of the Thane coastal road initiative. At present, there is no direct road connection between Kharegaon and Kopri, resulting in commuters having to take a detour of over 30 minutes. The new coastal road will significantly reduce travel time to approximately 15 to 20 minutes, benefitting the area's residents. The proposed coastal link road between Kharegaon and Kopri spans a length of 7.34 km. The MMRDA has started the process of appointing a consultant to prepare a feasibility report and proceed accordingly. The consultant will inspect the proposed road alignment, taking into account the potential construction of a bridge to connect both sides of the Thane Creek. Regarding other projects, the Thane coastal road project connecting Gaimukh and Balkum, estimated to be 13.21 km in length and costing Rs 45 billion, is still in the planning stage. However, it has faced obstacles due to opposition from residents of Mogharpada Village on Ghodbunder Road. The MMRDA intends to acquire the land occupied by the villagers, which is not only necessary for the Thane coastal road but also for establishing a car depot for the Metro 4 and Metro 4A Green Lines—Wadala-Ghatkopar-Kasarvadavali and Kasarvadavali-Gaimukh metro rail corridors. As the MMRDA makes progress with these infrastructure projects, they are carefully considering how to address challenges and ensure the effective implementation of these vital transportation links in Thane. Also read: Government of Maharashtra invites tenders for civil works IIT-Delhi flags chloride concern for buildings

Next Story
Infrastructure Urban

DDA Approves Rs 87.2 Billion Budget for 2025-26

The Delhi Development Authority (DDA) has approved a budget of Rs 87.2 billion for the financial year 2025-26, with a strong emphasis on civic infrastructure development, green space rejuvenation, housing, and sports facilities, according to an official statement. Chaired by Lieutenant Governor V.K. Saxena, the budget meeting highlighted several large-scale projects, including the revitalisation of the Yamuna floodplain, creation of expansive parks, and upgraded civic amenities. Out of the total outlay, Rs 41.4 billion has been earmarked for capital expenditure, covering new roads, infrastruc..

Next Story
Infrastructure Energy

Vi Taps Cisco to Power Next-Gen Network

Telecom operator Vodafone Idea (Vi) has joined hands with US-based tech major Cisco Systems to revamp its transport network infrastructure across India. The strategic partnership aims to enhance network performance, scalability, and user experience for both retail and enterprise customers. As part of the agreement, Vi will deploy Cisco’s advanced Multiprotocol Label Switching (MPLS) technology to create a high-capacity, software-driven transport network. This will significantly improve the telecom player’s ability to manage surging data traffic and support data-heavy digital services such..

Next Story
Building Material

GPT Infra Commissions New Steel Girder Plant Near Kolkata

GPT Infraprojects announced the successful commissioning of its steel girder and components manufacturing facility in West Bengal on April 24, 2025. Located in Village Majinan, Hooghly district—about 60 km from Kolkata—the plant begins operations with an initial capacity of 10,000 metric tonnes per annum (MTPA). The company stated that the facility is in the process of securing RDSO (Research Designs and Standards Organisation) approval for manufacturing steel bridge girders. Once approved, this unit is expected to become a key asset for the company’s steel bridge segment, catering to c..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?