Proposed Coastal Link to Connect Kharegaon-Anand Nagar in Kopri, Thane
ROADS & HIGHWAYS

Proposed Coastal Link to Connect Kharegaon-Anand Nagar in Kopri, Thane

The Mumbai Metropolitan Region Development Authority (MMRDA) has begun working on a significant coastal road project in Thane as the coastal road parallel to Ghodbunder Road faces challenges. It aims to enhance connectivity in the area by connecting Kharegaon and Anand Nagar at Kopri.

The plan for the proposed link road between Kharegaon and Anand Nagar at Kopri has been prepared. The feasibility of the project is being assessed as part of the second phase of the Thane coastal road initiative.

At present, there is no direct road connection between Kharegaon and Kopri, resulting in commuters having to take a detour of over 30 minutes. The new coastal road will significantly reduce travel time to approximately 15 to 20 minutes, benefitting the area's residents.

The proposed coastal link road between Kharegaon and Kopri spans a length of 7.34 km. The MMRDA has started the process of appointing a consultant to prepare a feasibility report and proceed accordingly. The consultant will inspect the proposed road alignment, taking into account the potential construction of a bridge to connect both sides of the Thane Creek.

Regarding other projects, the Thane coastal road project connecting Gaimukh and Balkum, estimated to be 13.21 km in length and costing Rs 45 billion, is still in the planning stage. However, it has faced obstacles due to opposition from residents of Mogharpada Village on Ghodbunder Road. The MMRDA intends to acquire the land occupied by the villagers, which is not only necessary for the Thane coastal road but also for establishing a car depot for the Metro 4 and Metro 4A Green Lines—Wadala-Ghatkopar-Kasarvadavali and Kasarvadavali-Gaimukh metro rail corridors.

As the MMRDA makes progress with these infrastructure projects, they are carefully considering how to address challenges and ensure the effective implementation of these vital transportation links in Thane.

Also read:
Government of Maharashtra invites tenders for civil works
IIT-Delhi flags chloride concern for buildings


"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The Mumbai Metropolitan Region Development Authority (MMRDA) has begun working on a significant coastal road project in Thane as the coastal road parallel to Ghodbunder Road faces challenges. It aims to enhance connectivity in the area by connecting Kharegaon and Anand Nagar at Kopri. The plan for the proposed link road between Kharegaon and Anand Nagar at Kopri has been prepared. The feasibility of the project is being assessed as part of the second phase of the Thane coastal road initiative. At present, there is no direct road connection between Kharegaon and Kopri, resulting in commuters having to take a detour of over 30 minutes. The new coastal road will significantly reduce travel time to approximately 15 to 20 minutes, benefitting the area's residents. The proposed coastal link road between Kharegaon and Kopri spans a length of 7.34 km. The MMRDA has started the process of appointing a consultant to prepare a feasibility report and proceed accordingly. The consultant will inspect the proposed road alignment, taking into account the potential construction of a bridge to connect both sides of the Thane Creek. Regarding other projects, the Thane coastal road project connecting Gaimukh and Balkum, estimated to be 13.21 km in length and costing Rs 45 billion, is still in the planning stage. However, it has faced obstacles due to opposition from residents of Mogharpada Village on Ghodbunder Road. The MMRDA intends to acquire the land occupied by the villagers, which is not only necessary for the Thane coastal road but also for establishing a car depot for the Metro 4 and Metro 4A Green Lines—Wadala-Ghatkopar-Kasarvadavali and Kasarvadavali-Gaimukh metro rail corridors. As the MMRDA makes progress with these infrastructure projects, they are carefully considering how to address challenges and ensure the effective implementation of these vital transportation links in Thane. Also read: Government of Maharashtra invites tenders for civil works IIT-Delhi flags chloride concern for buildings

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement