Proposed Coastal Link to Connect Kharegaon-Anand Nagar in Kopri, Thane
ROADS & HIGHWAYS

Proposed Coastal Link to Connect Kharegaon-Anand Nagar in Kopri, Thane

The Mumbai Metropolitan Region Development Authority (MMRDA) has begun working on a significant coastal road project in Thane as the coastal road parallel to Ghodbunder Road faces challenges. It aims to enhance connectivity in the area by connecting Kharegaon and Anand Nagar at Kopri.

The plan for the proposed link road between Kharegaon and Anand Nagar at Kopri has been prepared. The feasibility of the project is being assessed as part of the second phase of the Thane coastal road initiative.

At present, there is no direct road connection between Kharegaon and Kopri, resulting in commuters having to take a detour of over 30 minutes. The new coastal road will significantly reduce travel time to approximately 15 to 20 minutes, benefitting the area's residents.

The proposed coastal link road between Kharegaon and Kopri spans a length of 7.34 km. The MMRDA has started the process of appointing a consultant to prepare a feasibility report and proceed accordingly. The consultant will inspect the proposed road alignment, taking into account the potential construction of a bridge to connect both sides of the Thane Creek.

Regarding other projects, the Thane coastal road project connecting Gaimukh and Balkum, estimated to be 13.21 km in length and costing Rs 45 billion, is still in the planning stage. However, it has faced obstacles due to opposition from residents of Mogharpada Village on Ghodbunder Road. The MMRDA intends to acquire the land occupied by the villagers, which is not only necessary for the Thane coastal road but also for establishing a car depot for the Metro 4 and Metro 4A Green Lines—Wadala-Ghatkopar-Kasarvadavali and Kasarvadavali-Gaimukh metro rail corridors.

As the MMRDA makes progress with these infrastructure projects, they are carefully considering how to address challenges and ensure the effective implementation of these vital transportation links in Thane.

Also read:
Government of Maharashtra invites tenders for civil works
IIT-Delhi flags chloride concern for buildings


The Mumbai Metropolitan Region Development Authority (MMRDA) has begun working on a significant coastal road project in Thane as the coastal road parallel to Ghodbunder Road faces challenges. It aims to enhance connectivity in the area by connecting Kharegaon and Anand Nagar at Kopri. The plan for the proposed link road between Kharegaon and Anand Nagar at Kopri has been prepared. The feasibility of the project is being assessed as part of the second phase of the Thane coastal road initiative. At present, there is no direct road connection between Kharegaon and Kopri, resulting in commuters having to take a detour of over 30 minutes. The new coastal road will significantly reduce travel time to approximately 15 to 20 minutes, benefitting the area's residents. The proposed coastal link road between Kharegaon and Kopri spans a length of 7.34 km. The MMRDA has started the process of appointing a consultant to prepare a feasibility report and proceed accordingly. The consultant will inspect the proposed road alignment, taking into account the potential construction of a bridge to connect both sides of the Thane Creek. Regarding other projects, the Thane coastal road project connecting Gaimukh and Balkum, estimated to be 13.21 km in length and costing Rs 45 billion, is still in the planning stage. However, it has faced obstacles due to opposition from residents of Mogharpada Village on Ghodbunder Road. The MMRDA intends to acquire the land occupied by the villagers, which is not only necessary for the Thane coastal road but also for establishing a car depot for the Metro 4 and Metro 4A Green Lines—Wadala-Ghatkopar-Kasarvadavali and Kasarvadavali-Gaimukh metro rail corridors. As the MMRDA makes progress with these infrastructure projects, they are carefully considering how to address challenges and ensure the effective implementation of these vital transportation links in Thane. Also read: Government of Maharashtra invites tenders for civil works IIT-Delhi flags chloride concern for buildings

Next Story
Technology

AI-Enabled Workflows Lift Profitability and Productivity

Organisations modernising frontline workflows with artificial intelligence, automation and real-time data are reporting stronger financial performance, higher productivity and improved employee engagement, according to a global study by Zebra Technologies and Oxford Economics.The research covered 1,000 senior leaders across retail, manufacturing, transportation and logistics in the US, Mexico, the UK, Germany, India, Japan, Australia and New Zealand.In transportation and logistics, 54 per cent of companies that improved picking and packing operations reported faster operational performance, wh..

Next Story
Real Estate

India Leads Global AI Readiness but Implementation Lags

Indian companies lead global averages across all eight artificial intelligence readiness indicators tracked by JLL, but only 19 per cent have started making changes to their workplaces, according to the JLL 2026 Future of Work Survey.The study found that 77 per cent of Indian business leaders expect AI to change their office requirements, creating a 58-percentage-point gap between awareness and implementation. The survey covered more than 2,200 CEOs, CFOs and real estate leaders across 21 countries during the first quarter of 2026.Despite concerns over automation, 58 per cent of Indian leaders..

Next Story
Equipment

Three WOLFF Cranes Build Riyadh Cable-Stayed Bridges

Three WOLFF 180 B luffing jib cranes are supporting the construction of two cable-stayed bridges alongside the existing Wadi Laban Bridge in Riyadh, Saudi Arabia. The project is being developed for the Royal Commission for Riyadh City and executed by the ICRC joint venture comprising IC Ictas and Al Rashid Trading & Contracting Company.The cranes are handling lifting operations including formwork, reinforcement, concrete placement, work platforms, surveying equipment and other construction materials. Each crane is fitted with a 40 m jib, reaches a hook height of 157 m and offers a maximum ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement