DRA Infracon-led JV emerges as lowest bidder for Chennai Metro Phase 2
RAILWAYS & METRO RAIL

DRA Infracon-led JV emerges as lowest bidder for Chennai Metro Phase 2

On May 1, 2023, the Chennai Metro Rail (CMRL) unveiled the financial/price bids for the underground civil contract package UG-01/RT-01 (Madhavaram to Perambur) of Phase 2 corridors of the Chennai Metro Rail Project in Chennai.

According to the results of the financial bids opening, the consortium of Dineshchandra R. Agrawal Infracon and Soma Construction emerged as the lowest bidder for the construction of five underground metro stations for Corridor 23 of the Chennai Metro Rail Project Phase 2.

The scope of work includes constructing the underground stations at Thapalpetti, Moolakadai, Sembiyam, Perambur Market, and Perambur Metro, as well as the Crossover at Sembiyam, and work other than the Diaphragm wall of two underground stations at Madhavaram Milk Colony and Murari Hospital in connection with corridor 3 of Chennai Metro Rail Project Phase 2.

Also Read
Noida to buy 500 acre to raise new industrial sectors
TN Cabinet approves project that will bring Rs 35,000 cr investments

On May 1, 2023, the Chennai Metro Rail (CMRL) unveiled the financial/price bids for the underground civil contract package UG-01/RT-01 (Madhavaram to Perambur) of Phase 2 corridors of the Chennai Metro Rail Project in Chennai. According to the results of the financial bids opening, the consortium of Dineshchandra R. Agrawal Infracon and Soma Construction emerged as the lowest bidder for the construction of five underground metro stations for Corridor 23 of the Chennai Metro Rail Project Phase 2. The scope of work includes constructing the underground stations at Thapalpetti, Moolakadai, Sembiyam, Perambur Market, and Perambur Metro, as well as the Crossover at Sembiyam, and work other than the Diaphragm wall of two underground stations at Madhavaram Milk Colony and Murari Hospital in connection with corridor 3 of Chennai Metro Rail Project Phase 2. Also Read Noida to buy 500 acre to raise new industrial sectors TN Cabinet approves project that will bring Rs 35,000 cr investments

Next Story
Equipment

Company showcases North America-certified machinery and secures new deals

Zoomlion Heavy Industry Science & Technology Co., recently showcased a wide portfolio of North America-certified and customised construction equipment at CONEXPO-CON/AGG 2026 in Las Vegas. The display included engineering hoisting machinery, concrete equipment, earthmoving machinery, mining equipment and construction hoisting solutions tailored to regional operational requirements.All equipment presented at the exhibition complies with North American certification standards, with several models specifically developed to meet local regulatory requirements and site conditions. One of the hig..

Next Story
Technology

Sinoboom Launches Dual-ETM Smart Technology

Sinoboom recently introduced its Dual-ETM Smart Technology at CONEXPO-CON/AGG 2026, designed to enhance battery endurance and operational efficiency in electric boom lifts.The new technology integrates advanced components that enable real-time optimisation of power usage during equipment operation. By calculating the precise power requirement instantly, the system delivers only the energy needed for each movement, reducing the inefficiencies associated with conventional maximum-demand power systems.The solution incorporates multiple sensors—including pressure, weight, length and level sensor..

Next Story
Infrastructure Transport

Ramky Infra Wins Rs 14.01 Bn DMIC Project

Ramky Infrastructure has secured an engineering, procurement and construction (EPC) contract worth Rs 14.01 billion from Maharashtra Industrial Township Limited (MITL) for infrastructure development in Phase 1 of the Dighi Port Industrial Area (DPIA) under the Delhi–Mumbai Industrial Corridor (DMIC).The project, located in Raigad district of Maharashtra, involves comprehensive infrastructure works including design, engineering, construction, testing and commissioning, along with operations and maintenance. The contract includes a four-year operations and maintenance period after commissionin..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement