Kolkata Metro’s Airport Extension to Run on Weekends from 13 Sept
RAILWAYS & METRO RAIL

Kolkata Metro’s Airport Extension to Run on Weekends from 13 Sept

Kolkata’s metro network is set to become more accessible on weekends, as the Yellow Line’s newest stretch from Noapara to Jai Hind Bimanbandar will now operate services on Saturdays and Sundays starting 13 September.

The announcement follows Prime Minister Narendra Modi’s inauguration of the 6.5-kilometre extension on 22 August. Services began three days later, on 25 August, and were initially limited to weekdays. The line, which connects Noapara to the airport, has already witnessed growing ridership.

Earlier this week, the number of commuters travelling on the corridor in a single day crossed the 7,000 mark — a figure that encouraged Metro authorities to expand operations to weekends.

According to Metro Railway officials, a total of 44 services will run on Saturdays — 22 in each direction. On Sundays, 40 services will operate, with 20 in each direction.

The first train on Saturdays will depart Noapara at 7.35 am, with the last service scheduled for 8.32 pm. On Sundays, operations will start at 8.35 am and continue until 8.22 pm.

Trains will run at 35-minute intervals throughout the day, ensuring steady connectivity for passengers heading to the airport or neighbouring areas.

The move is expected to provide significant relief to weekend travellers, particularly air passengers.



Kolkata’s metro network is set to become more accessible on weekends, as the Yellow Line’s newest stretch from Noapara to Jai Hind Bimanbandar will now operate services on Saturdays and Sundays starting 13 September.The announcement follows Prime Minister Narendra Modi’s inauguration of the 6.5-kilometre extension on 22 August. Services began three days later, on 25 August, and were initially limited to weekdays. The line, which connects Noapara to the airport, has already witnessed growing ridership.Earlier this week, the number of commuters travelling on the corridor in a single day crossed the 7,000 mark — a figure that encouraged Metro authorities to expand operations to weekends.According to Metro Railway officials, a total of 44 services will run on Saturdays — 22 in each direction. On Sundays, 40 services will operate, with 20 in each direction.The first train on Saturdays will depart Noapara at 7.35 am, with the last service scheduled for 8.32 pm. On Sundays, operations will start at 8.35 am and continue until 8.22 pm.Trains will run at 35-minute intervals throughout the day, ensuring steady connectivity for passengers heading to the airport or neighbouring areas.The move is expected to provide significant relief to weekend travellers, particularly air passengers. 

Next Story
Infrastructure Urban

CM Inaugurates Rs 3.7 Billion Vilholi Water Treatment Plant in Nashik

Chief Minister Devendra Fadnavis inaugurated the Nashik Municipal Corporation’s 274 MLD Vilholi Water Treatment Plant and the upgraded Mukane water supply scheme, a Rs 3.7 billion project designed to provide a reliable and sustainable water supply to more than 55 lakh residents. The system will also cater to over 1 crore visitors expected during the 2027 Simhastha Kumbh Mela.Funded partly through Rs 2 billion Green Sustainable Bonds, the project strengthens Nashik’s long-term water security, ensures year-round availability, and enhances the city’s preparedness for peak tourist inflow. It..

Next Story
Infrastructure Urban

Indian Speciality Chemical Industry Poised for Strong Global Growth

The International Center for Biosaline Agriculture (ICBA), in partnership with Al Rostamani Group, has inaugurated three major facilities at its Dubai headquarters: a Training and Knowledge Transfer Building, a Plant Tissue Culture Laboratory, and an Integrated Agri-Aquaculture System. The launch took place in the presence of H.E. Dr. Amna bint Abdullah Al Dahak, Minister of Climate Change and Environment, marking a significant step forward in strengthening the UAE’s agricultural innovation ecosystem.Fully funded by Al Rostamani Group, the new facilities reinforce ICBA’s role as a leading ..

Next Story
Infrastructure Energy

Mooreast to Explore Up to 500 MW RE Projects in Timor-Leste

Mooreast Holdings, listed on the Singapore Exchange Catalist, announced that it will begin feasibility studies this month for the development of up to 500 megawatts (MW) of large-scale renewable energy (RE) projects in Timor-Leste.The studies follow a Letter of Intent (LOI) signed between Mooreast and the Secretario de Estado de Electricidade Agua e Saneamento (SEEAS), the secretariat for Electricity, Water and Sanitation under Timor-Leste’s Ministry of Public Works. Under the LOI, Mooreast will explore the development of 300–500 MW of floating renewable energy over the next five to ten ye..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement