Noida to receive a new skywalk worth Rs 250 mn
RAILWAYS & METRO RAIL

Noida to receive a new skywalk worth Rs 250 mn

According to the Noida Authority, work on the skywalk that would link the metro stations in Noida Sector 52 and Sector 51 has progressed. While Sector 52 is found on the Blue Line, Sector 51 is found on the Aqua Line. For individuals who must change lines to get between the two stations, a rickshaw or an autorickshaw is necessary. With the skywalk, the Noida Authority intends to alleviate this problem.

The Noida Authority has selected the project's agency. Inside the skywalk, a travelator with an automatic 5 m/s speed will also be placed. The government will put the travelator up for auction.

The skywalk will be completely air conditioned. The structure will cost approximately Rs 250 million. It will occupy approximately 480 meters of the skywalk. It will be completely waterproof.

The skywalk will benefit a large number of people. The Noida Authority will issue a DPR for the situation soon. Construction will take approximately five months.

The Skywalk will be 420 meters long and 5 meters wide, with a travelator that moves at 0.5 meters per second. The Skywalk is being built in the shape of a "L" because land next to the stations was given to a private company. The Skywalk would increase Aqua Line traffic by making it easier for commuters to travel between the Delhi and Noida Metro stations.

See also:
Skywalk linking New Delhi Rly Station & metro stations to open soon
Western Railways opens longest skywalk


According to the Noida Authority, work on the skywalk that would link the metro stations in Noida Sector 52 and Sector 51 has progressed. While Sector 52 is found on the Blue Line, Sector 51 is found on the Aqua Line. For individuals who must change lines to get between the two stations, a rickshaw or an autorickshaw is necessary. With the skywalk, the Noida Authority intends to alleviate this problem. The Noida Authority has selected the project's agency. Inside the skywalk, a travelator with an automatic 5 m/s speed will also be placed. The government will put the travelator up for auction. The skywalk will be completely air conditioned. The structure will cost approximately Rs 250 million. It will occupy approximately 480 meters of the skywalk. It will be completely waterproof. The skywalk will benefit a large number of people. The Noida Authority will issue a DPR for the situation soon. Construction will take approximately five months. The Skywalk will be 420 meters long and 5 meters wide, with a travelator that moves at 0.5 meters per second. The Skywalk is being built in the shape of a L because land next to the stations was given to a private company. The Skywalk would increase Aqua Line traffic by making it easier for commuters to travel between the Delhi and Noida Metro stations. See also: Skywalk linking New Delhi Rly Station & metro stations to open soonWestern Railways opens longest skywalk

Next Story
Infrastructure Transport

Taking Flight!

When Prime Minister Narendra Modi inaugurated the Navi Mumbai International Airport (NMIA) on October 8, 2025, it marked far more than the opening of another terminal – it signified a turning point in India’s aviation and infrastructure narrative. Developed by Adani Airport Holdings Ltd (AAHL) in partnership with the City and Industrial Development Corporation (CIDCO), NMIA represents a bold vision of how modern India intends to connect its people, power its economy and project its identity on the global stage.“The Navi Mumbai International Airport is a project that exemplifies the visio..

Next Story
Infrastructure Transport

Highway Guidelines 2.0

In August 2025, a Public Accounts Committee comprising members of the Lok Sabha and Rajya Sabha presented a report, ‘Levy and Regulation of Fees, Tariffs, User Charges etc on Public Infrastructure and Other Public Utilities in the context of the Ministry of Road Transport and Highways (MoRTH) and the National Highways Authority of India (NHAI).Having examined present design accountability, subcontracting, pavement failures, emergency response mechanisms, toll reforms, service quality, stakeholder consultations and other aspects, the Committee presented recommendations covering the planning a..

Next Story
Infrastructure Transport

Railways approves major upgrade for Telangana traction lines

The Ministry of Railways has approved the upgradation of the electric traction system in two crucial railway sections — Medchal–Mudkhed (225 km) and Mahbubnagar–Dhone (184 km). The projects, costing Rs 1.93 billion and Rs 1.23 billion respectively, will enhance the electric traction capacity from 1X25 KV to 2X25 KV. The work includes modifications to circuit breakers and switching stations, along with the installation of additional conductors. These routes serve as vital links between Northern and Southern India via Hyderabad. Once completed, the upgraded system will reduce voltage dro..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?