+
Guwahati Plans Rs 25 Billion Underground Power Project
ROADS & HIGHWAYS

Guwahati Plans Rs 25 Billion Underground Power Project

On July 10 the Assam government unveiled a major urban infrastructure package for Guwahati that includes a Rs 25 billion (Rs 2,500 crore) underground cabling project and a feasibility study for a metro along the proposed Guwahati Ring Road. The announcement was made during the presentation of the 2026-27 state budget by Finance Minister Jayanta Malla Baruah and is aimed at modernising the city's electrical network, enhancing public safety and improving streetscape aesthetics. The programme is intended to be implemented in phases with an emphasis on targeted interventions in high density corridors.

Phase I will allocate Rs 2 bn under the Revamped Distribution Sector Scheme to place power lines underground along five principal stretches of the city. The initial works have been identified for Paltan Bazar Square; AT Road from Paltan Bazar to Bharalumukh; MG Road from Bharalumukh to Padumphukhuri; GS Road from Paltan Bazar to GMCH Road including GMCH Road; and GS Road from Bhangagarh to the Dispur Secretariat. Officials have said the phased approach will allow coordination with other civic works and limit disruption to traffic and services.

The government also announced it will commission a feasibility study to consider integrating a metro rail system either on top of or alongside the ring road alignment. The proposed metro is intended to decongest central Guwahati and to shape planned urban expansion around satellite townships that are expected to develop along the corridor. Technical and financial assessments will determine alignment options, station locations and interface with existing transport networks.

The Guwahati Ring Road project envisages a 121-km corridor comprising a 55-km greenfield northern bypass, a 3-km six-lane bridge over the Brahmaputra and six-laning of NH-27 to improve regional connectivity. Planners indicated that the combined interventions in road and rail infrastructure are designed to enhance urban mobility and support economic growth in adjoining districts. The government did not set a detailed implementation timeline in the budget but said further project reports will follow.

On July 10 the Assam government unveiled a major urban infrastructure package for Guwahati that includes a Rs 25 billion (Rs 2,500 crore) underground cabling project and a feasibility study for a metro along the proposed Guwahati Ring Road. The announcement was made during the presentation of the 2026-27 state budget by Finance Minister Jayanta Malla Baruah and is aimed at modernising the city's electrical network, enhancing public safety and improving streetscape aesthetics. The programme is intended to be implemented in phases with an emphasis on targeted interventions in high density corridors. Phase I will allocate Rs 2 bn under the Revamped Distribution Sector Scheme to place power lines underground along five principal stretches of the city. The initial works have been identified for Paltan Bazar Square; AT Road from Paltan Bazar to Bharalumukh; MG Road from Bharalumukh to Padumphukhuri; GS Road from Paltan Bazar to GMCH Road including GMCH Road; and GS Road from Bhangagarh to the Dispur Secretariat. Officials have said the phased approach will allow coordination with other civic works and limit disruption to traffic and services. The government also announced it will commission a feasibility study to consider integrating a metro rail system either on top of or alongside the ring road alignment. The proposed metro is intended to decongest central Guwahati and to shape planned urban expansion around satellite townships that are expected to develop along the corridor. Technical and financial assessments will determine alignment options, station locations and interface with existing transport networks. The Guwahati Ring Road project envisages a 121-km corridor comprising a 55-km greenfield northern bypass, a 3-km six-lane bridge over the Brahmaputra and six-laning of NH-27 to improve regional connectivity. Planners indicated that the combined interventions in road and rail infrastructure are designed to enhance urban mobility and support economic growth in adjoining districts. The government did not set a detailed implementation timeline in the budget but said further project reports will follow.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code