Central Railway's Unreserved Summer Special Trains
East Central Railway Empanels Rooftop Solar
East Central Railway (ECR) has taken a significant step towards embracing renewable energy by announcing the empanelment of vendors for installing rooftop solar panels across its facilities. This initiative underscores the railway's commitment to sustainability and reducing its carbon footprint. The move aligns with national objectives to promote clean energy and reduce dependence on fossil fuels.
Rooftop solar panels offer a sustainable solution to power generation, harnessing the abundant sunlight available in the region. By leveraging solar energy, ECR aims to not only reduce its el..
Pune Central Railway invites solar power project bids for Maharashtra
The Pune Division of Central Railway has called for bids to enlist agencies for implementing grid-connected rooftop solar power projects in Maharashtra on a state-wise basis. The projects will operate through public-private partnerships and follow a design, build, finance, operate, and transfer model. The projects will fall under two capacity ranges: (i) above 10 kW and up to 100 kW, and (ii) above 100 kW and up to 500 kW. Bidders have the option to quote for either or both capacities. The projects are expected to be operational within 240 days from receiving the work order, with developers re..
East Central Railway seeks bids for 1.1 MW rooftop solar
The East Central Railway had announced the invitation for bids to empanel agencies for implementing 1.1 MW rooftop solar projects for the Samastipur division. It was stated that the last date for submitting bids was June 10, 2024, and the bids would be opened on the same day.
It was specified that the selected solar power developer would be responsible for overseeing all aspects of the project, including engineering, design, procurement, installation (including civil and structural components), testing, and commissioning of the solar systems. It was also mentioned that the developer mu..
Mumbai Metro Pre-Trial Reaches Dadar
"The Mumbai Metro's pre-trial phase has progressed to the Dadar station, marking a significant milestone in the city's metro rail project. This development signals the gradual expansion of metro services and infrastructure across Mumbai.
During the pre-trial phase, the Mumbai Metro undergoes rigorous testing and validation processes to ensure its safety, reliability, and operational readiness. The extension of pre-trial operations to the Dadar station demonstrates the steady progress of the metro project towards its eventual inauguration and public launch.
The Dadar station holds..
Metro Expansion on Hold Due to Funding Delay
"The expansion of the Nagpur Metro is currently on hold as the project awaits funds for widening the Nag River stretch. This delay has impeded progress on the metro project's extension, affecting plans for improving connectivity and transportation in Nagpur.
The widening of the Nag River stretch is a crucial component of the Nagpur Metro expansion project, aimed at enhancing the metro's reach and accessibility to various parts of the city. However, the lack of funding has stalled efforts to advance construction activities along this critical stretch.
Authorities overseeing the Na..