L&T bags largest railway electrification project order
RAILWAYS & METRO RAIL

L&T bags largest railway electrification project order

The Railway Strategic Business Group of L&T Construction has secured a mega contract from an authorised Japanese agency to construct 508 route km of high-speed electrification system works (Package No: EW 1) for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, popularly referred to as the bullet train project.

The scope of this package includes design, manufacture, supply, construction, installation, testing and commissioning of 2 x 25 kV power supply electrification system including traction substations, high-speed overhead equipment and MV/LV power distribution equipment works on design-build lump sum price basis.

It is a first of its kind railway electrification project for India involving the implementation of Japanese Shinkansen high speed electrification technology with sophisticated equipment including heavy compound catenary system, change over switches, etc.

Upon completion, this electrification system will enable trains to travel at up to 320 KMPH speed. The project is being funded by the Japan International Cooperation Agency (JICA) and is being implemented by an authorised Japanese agency acting for and on behalf of the National High Speed Rail Corporation (NHSRCL).

L&T is India?s leading player in the railway electrification domain, possessing expertise across various types of electrification systems i.e., conventional 1X25 kV system, high rise and low-rise 2X25 kV system for mainline and freight railways, 25 kV AC rigid and flexible overhead catenary systems for metros, 750/1500 V DC overhead catenary systems for metros & LRTs, special Japanese type feeder messenger systems for DC overhead electrification, DC third rail electrification systems, etc.

Commenting on this win, L&T Chairman & Managing Director SN Subrahmanyan said: ?This MAHSR Systems Package is critical for the success of the Bullet Train Project. Proud to say that this win shall place L&T?s Railways Business amongst the top global Railway System Integrators covering Mainline, Metro and High-Speed Rail segments. This success, on top of the earlier trackworks and civil packages, reflects the customer?s and the Japanese government?s huge trust on L&T?s design and execution capabilities. Realisation of MAHSR project will change the paradigm of long-distance transportation in the country.?

Adding to this, Rajeev Jyoti, Advisor to Chairman & Managing Director for Railways Business, said: ?This is the largest single railway electrification project order ever placed in India. Our Railways Business is now in a unique position to leverage our strengths in design, procurement, construction capabilities as well as our relationship with various Japanese stakeholders for successful execution. The experience & technology transfer from this project shall help L&T in developing credentials for such future High-Speed Rail projects in India and abroad.?

The Railway Strategic Business Group of L&T Construction has secured a mega contract from an authorised Japanese agency to construct 508 route km of high-speed electrification system works (Package No: EW 1) for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, popularly referred to as the bullet train project. The scope of this package includes design, manufacture, supply, construction, installation, testing and commissioning of 2 x 25 kV power supply electrification system including traction substations, high-speed overhead equipment and MV/LV power distribution equipment works on design-build lump sum price basis. It is a first of its kind railway electrification project for India involving the implementation of Japanese Shinkansen high speed electrification technology with sophisticated equipment including heavy compound catenary system, change over switches, etc. Upon completion, this electrification system will enable trains to travel at up to 320 KMPH speed. The project is being funded by the Japan International Cooperation Agency (JICA) and is being implemented by an authorised Japanese agency acting for and on behalf of the National High Speed Rail Corporation (NHSRCL). L&T is India?s leading player in the railway electrification domain, possessing expertise across various types of electrification systems i.e., conventional 1X25 kV system, high rise and low-rise 2X25 kV system for mainline and freight railways, 25 kV AC rigid and flexible overhead catenary systems for metros, 750/1500 V DC overhead catenary systems for metros & LRTs, special Japanese type feeder messenger systems for DC overhead electrification, DC third rail electrification systems, etc. Commenting on this win, L&T Chairman & Managing Director SN Subrahmanyan said: ?This MAHSR Systems Package is critical for the success of the Bullet Train Project. Proud to say that this win shall place L&T?s Railways Business amongst the top global Railway System Integrators covering Mainline, Metro and High-Speed Rail segments. This success, on top of the earlier trackworks and civil packages, reflects the customer?s and the Japanese government?s huge trust on L&T?s design and execution capabilities. Realisation of MAHSR project will change the paradigm of long-distance transportation in the country.? Adding to this, Rajeev Jyoti, Advisor to Chairman & Managing Director for Railways Business, said: ?This is the largest single railway electrification project order ever placed in India. Our Railways Business is now in a unique position to leverage our strengths in design, procurement, construction capabilities as well as our relationship with various Japanese stakeholders for successful execution. The experience & technology transfer from this project shall help L&T in developing credentials for such future High-Speed Rail projects in India and abroad.?

Next Story
Real Estate

Integrated Waterproofing Strategies

Waterproofing buildings used to be an annual pre-monsoon affair but the evolution of real-estate development has changed that approach. In new developments, developers are weaving waterproofing solutions into both the design and construction phases, an approach that Nikhil Madan, Managing Director, Mahima Group, says, “is all about ensuring lasting durability [of the building] and keeping lifecycle risks including water seepage and extensive maintenance to a minimum.”Watertight by designAluminium formwork systems aren’t commonly thought of as a waterproofing tool but at the Mahima Group,..

Next Story
Infrastructure Urban

GROHE Showcases Water-Led Design At Milan

GROHE unveiled its GROHE SPA Aqua Sanctuary at Milan Design Week 2026, transforming Piccolo Teatro Studio Melato into an immersive showcase of water, design and wellbeing. Built on the philosophy of ‘Wellbeing Through Water’, the installation reimagined bathrooms as holistic spaces for relaxation, rejuvenation and self-care.The Aqua Sanctuary was presented through three interconnected sanctums. The first showcased the 3D-printed GROHE SPA AquaTree shower and faucet, highlighting bespoke innovation and biophilic design. The second featured the Atrio Private Collection and GROHE SPA x Buster..

Next Story
Infrastructure Transport

Rahee Group Expands Rail Manufacturing Capacity

Rahee Group has outlined a multi-year investment roadmap to expand its operational footprint and strengthen manufacturing capabilities for India’s growing railway and urban transit sector. The Group is expanding in Odisha with a new Track Component Casting Unit, for which the groundbreaking ceremony was held on 8 April 2026 in the presence of Odisha Chief Minister Mohan Charan Majhi.The Group’s flagship EPC arm, Rahee Infratech Ltd, continues to focus on complex rail infrastructure projects, including track systems, bridges, viaducts and ballastless infrastructure. Its wholly owned subsidi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement