+
L&T bags largest railway electrification project order
RAILWAYS & METRO RAIL

L&T bags largest railway electrification project order

The Railway Strategic Business Group of L&T Construction has secured a mega contract from an authorised Japanese agency to construct 508 route km of high-speed electrification system works (Package No: EW 1) for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, popularly referred to as the bullet train project.

The scope of this package includes design, manufacture, supply, construction, installation, testing and commissioning of 2 x 25 kV power supply electrification system including traction substations, high-speed overhead equipment and MV/LV power distribution equipment works on design-build lump sum price basis.

It is a first of its kind railway electrification project for India involving the implementation of Japanese Shinkansen high speed electrification technology with sophisticated equipment including heavy compound catenary system, change over switches, etc.

Upon completion, this electrification system will enable trains to travel at up to 320 KMPH speed. The project is being funded by the Japan International Cooperation Agency (JICA) and is being implemented by an authorised Japanese agency acting for and on behalf of the National High Speed Rail Corporation (NHSRCL).

L&T is India?s leading player in the railway electrification domain, possessing expertise across various types of electrification systems i.e., conventional 1X25 kV system, high rise and low-rise 2X25 kV system for mainline and freight railways, 25 kV AC rigid and flexible overhead catenary systems for metros, 750/1500 V DC overhead catenary systems for metros & LRTs, special Japanese type feeder messenger systems for DC overhead electrification, DC third rail electrification systems, etc.

Commenting on this win, L&T Chairman & Managing Director SN Subrahmanyan said: ?This MAHSR Systems Package is critical for the success of the Bullet Train Project. Proud to say that this win shall place L&T?s Railways Business amongst the top global Railway System Integrators covering Mainline, Metro and High-Speed Rail segments. This success, on top of the earlier trackworks and civil packages, reflects the customer?s and the Japanese government?s huge trust on L&T?s design and execution capabilities. Realisation of MAHSR project will change the paradigm of long-distance transportation in the country.?

Adding to this, Rajeev Jyoti, Advisor to Chairman & Managing Director for Railways Business, said: ?This is the largest single railway electrification project order ever placed in India. Our Railways Business is now in a unique position to leverage our strengths in design, procurement, construction capabilities as well as our relationship with various Japanese stakeholders for successful execution. The experience & technology transfer from this project shall help L&T in developing credentials for such future High-Speed Rail projects in India and abroad.?

The Railway Strategic Business Group of L&T Construction has secured a mega contract from an authorised Japanese agency to construct 508 route km of high-speed electrification system works (Package No: EW 1) for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, popularly referred to as the bullet train project. The scope of this package includes design, manufacture, supply, construction, installation, testing and commissioning of 2 x 25 kV power supply electrification system including traction substations, high-speed overhead equipment and MV/LV power distribution equipment works on design-build lump sum price basis. It is a first of its kind railway electrification project for India involving the implementation of Japanese Shinkansen high speed electrification technology with sophisticated equipment including heavy compound catenary system, change over switches, etc. Upon completion, this electrification system will enable trains to travel at up to 320 KMPH speed. The project is being funded by the Japan International Cooperation Agency (JICA) and is being implemented by an authorised Japanese agency acting for and on behalf of the National High Speed Rail Corporation (NHSRCL). L&T is India?s leading player in the railway electrification domain, possessing expertise across various types of electrification systems i.e., conventional 1X25 kV system, high rise and low-rise 2X25 kV system for mainline and freight railways, 25 kV AC rigid and flexible overhead catenary systems for metros, 750/1500 V DC overhead catenary systems for metros & LRTs, special Japanese type feeder messenger systems for DC overhead electrification, DC third rail electrification systems, etc. Commenting on this win, L&T Chairman & Managing Director SN Subrahmanyan said: ?This MAHSR Systems Package is critical for the success of the Bullet Train Project. Proud to say that this win shall place L&T?s Railways Business amongst the top global Railway System Integrators covering Mainline, Metro and High-Speed Rail segments. This success, on top of the earlier trackworks and civil packages, reflects the customer?s and the Japanese government?s huge trust on L&T?s design and execution capabilities. Realisation of MAHSR project will change the paradigm of long-distance transportation in the country.? Adding to this, Rajeev Jyoti, Advisor to Chairman & Managing Director for Railways Business, said: ?This is the largest single railway electrification project order ever placed in India. Our Railways Business is now in a unique position to leverage our strengths in design, procurement, construction capabilities as well as our relationship with various Japanese stakeholders for successful execution. The experience & technology transfer from this project shall help L&T in developing credentials for such future High-Speed Rail projects in India and abroad.?

Next Story
Technology

Six ways a smarter workflow leads to faster, more accurate bids

In today’s fast-paced civil construction environment, estimators need more than just solid numbers. They need smart, streamlined processes. This article explores six key ways connected workflows can transform the estimated approach, help in minimising risk, move faster, and improve accuracy. By integrating tools, data, and teams, one can produce stronger bids with less rework, fewer surprises, and more confidence. As an estimator, the job goes beyond producing numbers. They are responsible for delivering bids that are fast, accurate, and built to win. In today’s civil construction ind..

Next Story
Real Estate

Experion Launches Women-Only Co-Living Project in Greater Noida

Experion, part of Singapore-based AT Capital Group, has launched its first co-living space under its managed rental housing brand, VLIV, in Greater Noida. The all-women residence features 730 twin-sharing beds with a strong focus on safety, comfort, and well-being. VLIV has committed a $300 million investment to create a structured, service-led rental housing ecosystem in India. The brand aims to scale up to 20,000 beds in the next few years, with a long-term target of 100,000 beds nationwide. “India’s rental housing is fragmented. VLIV is our way of building long-term, dependabl..

Next Story
Infrastructure Urban

Officine Maccaferri Acquires CPT to Bolster Tunnelling Tech

Ambienta’s platform company, Officine Maccaferri S.p.A., has acquired CPT Group, a leading Italian developer of robotic prefabrication systems and digital control technologies for mechanised tunnelling. The move positions Maccaferri as a global player in integrated tunnelling solutions, blending traditional and advanced mechanised systems. Based in Nova Milanese, CPT serves major global contractors across Europe, Southeast Asia, and Australia. The company offers robotic prefabrication (Robofactory), productivity-monitoring software for Tunnel Boring Machines (TBMs), and eco-designed spa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?