PM Launches Next Phase Of UDAN And Opens Jodhpur Terminal
AVIATION & AIRPORTS

PM Launches Next Phase Of UDAN And Opens Jodhpur Terminal

The Prime Minister launched the next phase of UDAN and inaugurated the new terminal building at Jodhpur Airport, with senior central and state leaders in attendance, underlining the Government's focus on expanding regional air connectivity and infrastructure development.

Launched in October 2016, the UDAN scheme has operationalised 669 routes and connected 95 airports, heliports and water aerodromes, benefiting about 16.6 million (mn) passengers. The Union Cabinet approved the Modified UDAN scheme on 25 March 2026 with an outlay of Rs 290 billion (bn) over the next ten years to accelerate aviation-led development and advance the vision of Viksit Bharat 2047.

The Modified UDAN focuses on expanding regional infrastructure by developing 100 aerodromes from existing unserved airstrips with an investment of Rs 121.59 bn, providing Rs 25.77 bn towards operations and maintenance support for regional airports, and investing Rs 36.61 bn to develop 200 modern helipads. Continued viability gap funding of Rs 100.43 bn is earmarked to sustain regional airline operations, while the scheme promotes induction of indigenous aircraft and helicopters, including HAL Dhruv and Dornier platforms for underserved regions.

The new terminal at Jodhpur was developed by the Airports Authority of India at a cost of Rs 4.8 bn. Spread across 23,342 square metres, the facility is designed to handle 1,500 passengers during peak hours and about 2 million (mn) passengers annually, and includes 20 check-in counters, advanced security screening, modern baggage handling systems and six aerobridges. The apron can accommodate 11 A-321 aircraft and one ATR-72 aircraft, and the city-side layout provides parking for around 320 cars.

The existing terminal had reached saturation with an annual capacity of about 0.4 million (mn) passengers, prompting the expansion to meet future demand. The new facility incorporates energy-efficient systems, water conservation measures and green building practices aimed at achieving a five-Star GRIHA rating, while its architecture draws on Rajasthan's royal heritage to showcase cultural identity alongside modern passenger amenities.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The Prime Minister launched the next phase of UDAN and inaugurated the new terminal building at Jodhpur Airport, with senior central and state leaders in attendance, underlining the Government's focus on expanding regional air connectivity and infrastructure development. Launched in October 2016, the UDAN scheme has operationalised 669 routes and connected 95 airports, heliports and water aerodromes, benefiting about 16.6 million (mn) passengers. The Union Cabinet approved the Modified UDAN scheme on 25 March 2026 with an outlay of Rs 290 billion (bn) over the next ten years to accelerate aviation-led development and advance the vision of Viksit Bharat 2047. The Modified UDAN focuses on expanding regional infrastructure by developing 100 aerodromes from existing unserved airstrips with an investment of Rs 121.59 bn, providing Rs 25.77 bn towards operations and maintenance support for regional airports, and investing Rs 36.61 bn to develop 200 modern helipads. Continued viability gap funding of Rs 100.43 bn is earmarked to sustain regional airline operations, while the scheme promotes induction of indigenous aircraft and helicopters, including HAL Dhruv and Dornier platforms for underserved regions. The new terminal at Jodhpur was developed by the Airports Authority of India at a cost of Rs 4.8 bn. Spread across 23,342 square metres, the facility is designed to handle 1,500 passengers during peak hours and about 2 million (mn) passengers annually, and includes 20 check-in counters, advanced security screening, modern baggage handling systems and six aerobridges. The apron can accommodate 11 A-321 aircraft and one ATR-72 aircraft, and the city-side layout provides parking for around 320 cars. The existing terminal had reached saturation with an annual capacity of about 0.4 million (mn) passengers, prompting the expansion to meet future demand. The new facility incorporates energy-efficient systems, water conservation measures and green building practices aimed at achieving a five-Star GRIHA rating, while its architecture draws on Rajasthan's royal heritage to showcase cultural identity alongside modern passenger amenities.

Next Story
Real Estate

Mayfair Housing adopts Autodesk Forma for digital project planning

Mayfair Housing has entered into a three-year strategic partnership with Autodesk to deploy Autodesk Forma, an AI-enabled cloud platform, as part of its digital transformation programme aimed at improving project planning and execution across its development and redevelopment portfolio.The platform will be integrated into the company's Building Information Modelling (BIM) workflow to support architects, planners and project teams during the early stages of design and development. Autodesk Forma combines real-world data, environmental simulations and collaborative workflows to facilitate data-d..

Next Story
Infrastructure Transport

Bhadradri Kothagudem Greenfield Airport Proposal Advances

The plan for a greenfield airport for Bhadradri Kothagudem in Telangana has moved closer to realisation after the state government chose two sites following a feasibility study. Seethampeta and Sujathanagar were identified as the most feasible locations based on land, terrain, environmental impact, runway alignment and transport links. The proposal now awaits approval from the Union government. Raj Technologies prepared the feasibility study after examining six potential sites and concluded that around 667 acres can be developed at the two preferred locations without major technical or environ..

Next Story
Infrastructure Transport

Srinagar Airport Withdraws Proposed Full Runway Closure

Srinagar International Airport has withdrawn a proposed Notice to Airmen for a full runway closure, ensuring uninterrupted daytime flights this year. An operational update on X said there would be no full airfield closure during 2026 and that operations would continue daily with operational hours from 0800 hours to 1700 hours. Night closures for maintenance will continue until October 2026. Airlines have been told to update schedules and passengers have been advised to check flight status with their respective carriers before travelling. The airport urged reliance on official channels for auth..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement