Khammam to have three new greenfield highways
ROADS & HIGHWAYS

Khammam to have three new greenfield highways

Three new greenfield highways are being planned in the Khammam district, covering a distance of 100 km costing Rs 2,200 crore.

As part of this, a four-lane access-controlled greenfield highway portion of national highway (NH) 365BG (Khammam - Devarapalle segment) would be built from Thallampadu village to Somavaram village over a distance of 33 km for Rs 772 crore.

Besides that, under the Khammam-Devarapalle portion of NH-365BG, four-lane access-controlled greenfield roads would be built between Somavaram village to Chintagudem village (29 km) for Rs 637 crore and from Chintagudem village to Thumburu village (42 km) for Rs 804 crore.

The green motorways (Plantation, Beautification, and Maintenance) Policy is being used to build these greenfield highways.

As part of this, the implementing agency must plant bushes beside the route, which act as natural air pollution sinks. In addition to turfing and landscaping, the chosen agency would be responsible for planting attractive trees and shrubs in strategic locations.

Meanwhile, the Ministry of Road Transport and Highways (MoRTH) has designated competent authorities to acquire land for constructing a greenfield regional highway linking Sangareddy, Yadadri-Bhuvanagiri through Medak and Siddipet on Hyderabad's northern outskirts.

The Centre has set up Rs 1,556 crore for the four-laning of two existing lanes on NH-365BB between Suryapet and Khammam (old SH-42).

This 59 km length is critical for the state since it connects Telangana to Andhra Pradesh's ports. Around 75% of the work has been performed so far, and the project is likely to be completed by September.

Image Source

Also read: More greenfield highways to be built as part of NH development

Three new greenfield highways are being planned in the Khammam district, covering a distance of 100 km costing Rs 2,200 crore. As part of this, a four-lane access-controlled greenfield highway portion of national highway (NH) 365BG (Khammam - Devarapalle segment) would be built from Thallampadu village to Somavaram village over a distance of 33 km for Rs 772 crore. Besides that, under the Khammam-Devarapalle portion of NH-365BG, four-lane access-controlled greenfield roads would be built between Somavaram village to Chintagudem village (29 km) for Rs 637 crore and from Chintagudem village to Thumburu village (42 km) for Rs 804 crore. The green motorways (Plantation, Beautification, and Maintenance) Policy is being used to build these greenfield highways. As part of this, the implementing agency must plant bushes beside the route, which act as natural air pollution sinks. In addition to turfing and landscaping, the chosen agency would be responsible for planting attractive trees and shrubs in strategic locations. Meanwhile, the Ministry of Road Transport and Highways (MoRTH) has designated competent authorities to acquire land for constructing a greenfield regional highway linking Sangareddy, Yadadri-Bhuvanagiri through Medak and Siddipet on Hyderabad's northern outskirts. The Centre has set up Rs 1,556 crore for the four-laning of two existing lanes on NH-365BB between Suryapet and Khammam (old SH-42). This 59 km length is critical for the state since it connects Telangana to Andhra Pradesh's ports. Around 75% of the work has been performed so far, and the project is likely to be completed by September. Image Source Also read: More greenfield highways to be built as part of NH development

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->