+
 Khammam to have three new greenfield highways
ROADS & HIGHWAYS

Khammam to have three new greenfield highways

Three new greenfield highways are being planned in the Khammam district, covering a distance of 100 km costing Rs 2,200 crore.

As part of this, a four-lane access-controlled greenfield highway portion of national highway (NH) 365BG (Khammam - Devarapalle segment) would be built from Thallampadu village to Somavaram village over a distance of 33 km for Rs 772 crore.

Besides that, under the Khammam-Devarapalle portion of NH-365BG, four-lane access-controlled greenfield roads would be built between Somavaram village to Chintagudem village (29 km) for Rs 637 crore and from Chintagudem village to Thumburu village (42 km) for Rs 804 crore.

The green motorways (Plantation, Beautification, and Maintenance) Policy is being used to build these greenfield highways.

As part of this, the implementing agency must plant bushes beside the route, which act as natural air pollution sinks. In addition to turfing and landscaping, the chosen agency would be responsible for planting attractive trees and shrubs in strategic locations.

Meanwhile, the Ministry of Road Transport and Highways (MoRTH) has designated competent authorities to acquire land for constructing a greenfield regional highway linking Sangareddy, Yadadri-Bhuvanagiri through Medak and Siddipet on Hyderabad's northern outskirts.

The Centre has set up Rs 1,556 crore for the four-laning of two existing lanes on NH-365BB between Suryapet and Khammam (old SH-42).

This 59 km length is critical for the state since it connects Telangana to Andhra Pradesh's ports. Around 75% of the work has been performed so far, and the project is likely to be completed by September.

Image Source

Also read: More greenfield highways to be built as part of NH development

Three new greenfield highways are being planned in the Khammam district, covering a distance of 100 km costing Rs 2,200 crore. As part of this, a four-lane access-controlled greenfield highway portion of national highway (NH) 365BG (Khammam - Devarapalle segment) would be built from Thallampadu village to Somavaram village over a distance of 33 km for Rs 772 crore. Besides that, under the Khammam-Devarapalle portion of NH-365BG, four-lane access-controlled greenfield roads would be built between Somavaram village to Chintagudem village (29 km) for Rs 637 crore and from Chintagudem village to Thumburu village (42 km) for Rs 804 crore. The green motorways (Plantation, Beautification, and Maintenance) Policy is being used to build these greenfield highways. As part of this, the implementing agency must plant bushes beside the route, which act as natural air pollution sinks. In addition to turfing and landscaping, the chosen agency would be responsible for planting attractive trees and shrubs in strategic locations. Meanwhile, the Ministry of Road Transport and Highways (MoRTH) has designated competent authorities to acquire land for constructing a greenfield regional highway linking Sangareddy, Yadadri-Bhuvanagiri through Medak and Siddipet on Hyderabad's northern outskirts. The Centre has set up Rs 1,556 crore for the four-laning of two existing lanes on NH-365BB between Suryapet and Khammam (old SH-42). This 59 km length is critical for the state since it connects Telangana to Andhra Pradesh's ports. Around 75% of the work has been performed so far, and the project is likely to be completed by September. Image Source Also read: More greenfield highways to be built as part of NH development

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Assam Gets Approval For 350,000 PMAY Homes

Assam Chief Minister Himanta Biswa Sarma met Union Agriculture Minister Shivraj Singh Chouhan in New Delhi, where the minister handed an approval document for 310,000 new homes under the Pradhan Mantri Awas Yojana. The chief minister subsequently posted on X expressing gratitude and noting that the minister had formally handed approval for 380,000 homes as well. The release and the social media post contained varying figures, with broader references to 350,000 homes reported in some summaries. The approvals carry central assistance equivalent to Rs 50 billion (bn), corresponding to the five th..

Next Story
Infrastructure Urban

KPIGreen Achieves Highest Energised Capacity of 630+ MW DC

KPI Green Energy energised more than 630 MW DC of capacity in the June to August quarter, marking the highest quarterly addition in the company's history. The capacity was brought online across its Independent Power Producer (IPP) and Engineering, Procurement and Construction (EPC) businesses. The company said the achievement reflected the scale, speed and consistency of its project execution engine. The firm described the quarter as a material operational milestone since its founding. The milestone covers a diversified mix of IPP assets and projects executed under the EPC vertical, spanning u..

Next Story
Infrastructure Energy

Adani Energy Solutions Wins Rs 47 bn Maharashtra Transmission Project

Adani Energy Solutions has won a transmission contract in Maharashtra valued at Rs 47 billion (Rs 47 bn) to evacuate 4,500 megawatt (MW) of renewable and storage power. The company informed exchanges that the project will facilitate pumped storage potential near Satara and strengthen the inter-regional corridor between the Western and Southern grids. The award follows a competitive bidding process and will support renewable energy evacuation to major load centres in the state. The scope includes establishment of a 765/400 kV substation at Satara, construction of a Kolhapur-Satara 765 kV double..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code