JICA to build 5 road projects in Sikkim valued at Rs 14.40 billion
ROADS & HIGHWAYS

JICA to build 5 road projects in Sikkim valued at Rs 14.40 billion

The Japan International Cooperation Agency (JICA) has committed to undertaking five significant road projects in Sikkim, with a total estimated cost of Rs 14.40 billion. Presently, teams are conducting site inspections to evaluate the project areas.

The road projects proposed by JICA in Sikkim include:
  • The 45 km road from Singtam to Rangpo, passing through Chew Botey, Pache Kahani, will be widened and upgraded, with an estimated cost of Rs 3.91 billion.
  • The 27 km road from Balguney to Soreng via Gelling and Chakung will undergo widening, upgradation, and carpeting, with an estimated budget of Rs 2.22 billion.
  • A 60 km stretch along Phamtam, Mangnam, Pokhari, Dhupidara, Labdang, Kongri, and Tashiding will be widened, upgraded, and carpeted, with a projected cost of Rs 4.80 billion.
  • The 30 km road from Pangthang to Dikchu via Tintek will also be widened, upgraded, and carpeted, with an estimated expenditure of Rs 2.40 billion.
Additionally, JICA plans to build a two-lane bridge at Jalipool along the Ranipool-Pakyong road and upgrade the Jalipool to Ranipool road at an estimated cost of Rs 290 million. These projects collectively aim to enhance infrastructure and improve connectivity in Sikkim.

The Japan International Cooperation Agency (JICA) has committed to undertaking five significant road projects in Sikkim, with a total estimated cost of Rs 14.40 billion. Presently, teams are conducting site inspections to evaluate the project areas.The road projects proposed by JICA in Sikkim include:The 45 km road from Singtam to Rangpo, passing through Chew Botey, Pache Kahani, will be widened and upgraded, with an estimated cost of Rs 3.91 billion.The 27 km road from Balguney to Soreng via Gelling and Chakung will undergo widening, upgradation, and carpeting, with an estimated budget of Rs 2.22 billion.A 60 km stretch along Phamtam, Mangnam, Pokhari, Dhupidara, Labdang, Kongri, and Tashiding will be widened, upgraded, and carpeted, with a projected cost of Rs 4.80 billion.The 30 km road from Pangthang to Dikchu via Tintek will also be widened, upgraded, and carpeted, with an estimated expenditure of Rs 2.40 billion.Additionally, JICA plans to build a two-lane bridge at Jalipool along the Ranipool-Pakyong road and upgrade the Jalipool to Ranipool road at an estimated cost of Rs 290 million. These projects collectively aim to enhance infrastructure and improve connectivity in Sikkim.

Next Story
Resources

Ajmera Realty launches tree drive on Environment Day

Ajmera Realty & Infra India marked World Environment Day with a large-scale tree plantation initiative—Plant-with-Purpose—across its projects in Mumbai and Bangalore. The drive was inaugurated at Ajmera Manhattan and Ajmera Greenfinity in Wadala, with senior company officials and residents in attendance. The campaign encourages residents to embrace eco-conscious, self-reliant lifestyles by growing useful plants and trees within their communities. Horticulture expert Devendra Bhekar guided residents on creating and maintaining green spaces. Ajmera Realty planted over 500 trees..

Next Story
Resources

Twaron®-reinforced tyre powers Brunel’s solar race car

Teijin Aramid’s Twaron® with circular content will debut in Bridgestone’s race tyres for the 2025 Bridgestone World Solar Challenge, supporting the Brunel Solar Team’s Nuna 13 car. This marks the first use of the recycled-content aramid in a high-performance race tyre. The Twaron®-reinforced belts help enhance durability, reduce rolling resistance, and maintain lightweight strength—critical for the 3,000-km solar race across Australia. Bridgestone combines this with ENLITENTM tech and other recycled inputs to maximise environmental and performance outcomes. Teijin Aramid, a..

Next Story
Building Material

Kamdhenu Paints launches new wood coating range

Kamdhenu Paints has launched a comprehensive premium wood coating range designed for both interior and exterior applications. The collection includes high-performance solutions like Kamwood 2K PU for a rich matt or high-gloss finish, Kamwood 1K PU for clarity and stain protection, and the Kamwood Melamyne system for a smooth, durable finish. Also featured are Kamwood Wood Stains, which enhance wood grains with vibrant colour, and NC Sanding Sealer for high-build grain filling. The range is supported by Kamwood Thinners for ease of application and optimal finish. Saurabh Agarwal, MD, ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?