Noida To Build Diamond-shaped Interchange At Bhangel Elevated Road
ROADS & HIGHWAYS

Noida To Build Diamond-shaped Interchange At Bhangel Elevated Road

The Noida Authority (NA) has announced plans to construct a diamond-shaped interchange on the Bhangel Elevated Road to relieve chronic congestion and improve connectivity in the southern sector of the city. The project is part of a larger programme of road upgrades designed to streamline traffic flows and support urban growth. The interchange will link the elevated corridor with surface roads to distribute vehicles more efficiently and reduce bottlenecks at key junctions. The NA said the initiative targets peak hour congestion and aims to support planned residential and commercial development in surrounding sectors.

Engineers have planned a compact diamond layout that will include four directional ramps and two carriageways on the elevated stretch to maintain uninterrupted flow. The design is intended to facilitate smoother merging and diverging of traffic and to accommodate public transport and goods vehicles without major delays. The NA has completed preliminary surveys and developed detailed drawings to integrate the new structure with existing utilities and drainage systems. Materials and construction methods will be selected to allow rapid assembly and minimal closure of existing lanes.

Officials anticipate that the interchange will shorten travel times for commuters and improve road safety by segregating turning movements from through traffic. The scheme also includes provisions for pedestrian crossings, cycle tracks and improved signage to enhance multimodal accessibility. Environmental safeguards will be applied during construction to manage dust, noise and run-off and to protect nearby green spaces. The authority will monitor traffic patterns after opening to fine tune signal timings and lane allocations.

The NA has stated that construction will be undertaken in phases to minimise disruption and maintain traffic movement on the elevated road. Funding will be drawn from the authority's infrastructure budget and coordinated with central and state programmes where applicable. Detailed timelines and contractor appointments will be announced following the tendering process and final approvals. Community outreach will inform residents of diversions and safety measures during works.

The Noida Authority (NA) has announced plans to construct a diamond-shaped interchange on the Bhangel Elevated Road to relieve chronic congestion and improve connectivity in the southern sector of the city. The project is part of a larger programme of road upgrades designed to streamline traffic flows and support urban growth. The interchange will link the elevated corridor with surface roads to distribute vehicles more efficiently and reduce bottlenecks at key junctions. The NA said the initiative targets peak hour congestion and aims to support planned residential and commercial development in surrounding sectors. Engineers have planned a compact diamond layout that will include four directional ramps and two carriageways on the elevated stretch to maintain uninterrupted flow. The design is intended to facilitate smoother merging and diverging of traffic and to accommodate public transport and goods vehicles without major delays. The NA has completed preliminary surveys and developed detailed drawings to integrate the new structure with existing utilities and drainage systems. Materials and construction methods will be selected to allow rapid assembly and minimal closure of existing lanes. Officials anticipate that the interchange will shorten travel times for commuters and improve road safety by segregating turning movements from through traffic. The scheme also includes provisions for pedestrian crossings, cycle tracks and improved signage to enhance multimodal accessibility. Environmental safeguards will be applied during construction to manage dust, noise and run-off and to protect nearby green spaces. The authority will monitor traffic patterns after opening to fine tune signal timings and lane allocations. The NA has stated that construction will be undertaken in phases to minimise disruption and maintain traffic movement on the elevated road. Funding will be drawn from the authority's infrastructure budget and coordinated with central and state programmes where applicable. Detailed timelines and contractor appointments will be announced following the tendering process and final approvals. Community outreach will inform residents of diversions and safety measures during works.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code