Uttarakhand CM Lays Foundation Stone For Sahaspur Road Works
ROADS & HIGHWAYS

Uttarakhand CM Lays Foundation Stone For Sahaspur Road Works

Uttarakhand Chief Minister Pushkar Singh Dhami laid the foundation stone for the second phase, kilometre one to 10, of a road widening project in the Sahaspur Assembly constituency of Dehradun district. The work will cover the stretch from Mithiberry to Parwal up to Chandni Chowk and from Parwal to Vigyan Dham Jhajhra. The project will be built at a cost of Rs 120.34 million (mn). The phase aims to improve connectivity across the constituency.

The Chief Minister said that strong road infrastructure underpins the state’s development and that improved links will accelerate local trade, tourism, education and healthcare, thereby strengthening the regional economy. He approved related civic measures including a drinking water supply scheme, drainage works, construction of a cremation ground referred to as Mokshdham, and embankment or pushta works. These measures were presented as addressing both urban and rural needs.

Key works for the Sahaspur constituency include construction of a tubewell for Bhauwala, a drain from Daru Chowk to the Keshavwala river to mitigate waterlogging, and a Mokshdham near Arcadia Badowala Park. Additional projects comprise embankment and road construction from Asanpur to the cremation ground, embankment works on the Asan River at Umedpur and Parwal to protect agricultural land, embankment for the Badowala residential area in Municipal Ward number 93, and road and embankment work in Pondha to prevent land erosion. The package was presented as a coordinated response to local infrastructure deficits.

The state government expressed a commitment to expanding basic infrastructure and highlighted a special focus on women’s empowerment. The Chief Minister pointed to the Lakhpati Didi scheme and said women organised through self help groups are producing competitive products, which was described as bolstering the hill economy by enabling market access for local producers. Such measures were cited as part of broader inclusive development aims.

He said that under the Prime Minister India had become the fourth largest economy, that Uttarakhand’s economy had grown 26-fold and that reverse migration had risen by 44 per cent. Budget size had crossed Rs one trillion (tn) and preparations were under way for 10,000 to 12,000 recruitments this financial year while the government signalled support for a uniform civil code and strong action against illegal encroachment and the land mafia.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Uttarakhand Chief Minister Pushkar Singh Dhami laid the foundation stone for the second phase, kilometre one to 10, of a road widening project in the Sahaspur Assembly constituency of Dehradun district. The work will cover the stretch from Mithiberry to Parwal up to Chandni Chowk and from Parwal to Vigyan Dham Jhajhra. The project will be built at a cost of Rs 120.34 million (mn). The phase aims to improve connectivity across the constituency. The Chief Minister said that strong road infrastructure underpins the state’s development and that improved links will accelerate local trade, tourism, education and healthcare, thereby strengthening the regional economy. He approved related civic measures including a drinking water supply scheme, drainage works, construction of a cremation ground referred to as Mokshdham, and embankment or pushta works. These measures were presented as addressing both urban and rural needs. Key works for the Sahaspur constituency include construction of a tubewell for Bhauwala, a drain from Daru Chowk to the Keshavwala river to mitigate waterlogging, and a Mokshdham near Arcadia Badowala Park. Additional projects comprise embankment and road construction from Asanpur to the cremation ground, embankment works on the Asan River at Umedpur and Parwal to protect agricultural land, embankment for the Badowala residential area in Municipal Ward number 93, and road and embankment work in Pondha to prevent land erosion. The package was presented as a coordinated response to local infrastructure deficits. The state government expressed a commitment to expanding basic infrastructure and highlighted a special focus on women’s empowerment. The Chief Minister pointed to the Lakhpati Didi scheme and said women organised through self help groups are producing competitive products, which was described as bolstering the hill economy by enabling market access for local producers. Such measures were cited as part of broader inclusive development aims. He said that under the Prime Minister India had become the fourth largest economy, that Uttarakhand’s economy had grown 26-fold and that reverse migration had risen by 44 per cent. Budget size had crossed Rs one trillion (tn) and preparations were under way for 10,000 to 12,000 recruitments this financial year while the government signalled support for a uniform civil code and strong action against illegal encroachment and the land mafia.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement