Greater Noida Metro Link Work to Accelerate Post Poll Code Lift
RAILWAYS & METRO RAIL

Greater Noida Metro Link Work to Accelerate Post Poll Code Lift

Work on the Greater Noida Metro link is set to accelerate once the post-poll code is lifted, signaling a renewed push towards enhancing public transportation infrastructure in the region. This development comes as a positive sign for commuters and residents, as the Metro link project holds the promise of improving connectivity and easing travel woes in Greater Noida.

With the impending lifting of the post-poll code, construction activities on the Metro link are expected to gain momentum, bringing the project closer to fruition. The Metro link is anticipated to provide a convenient and efficient mode of transportation for commuters, connecting key areas within Greater Noida and facilitating seamless travel across the region.

The acceleration of work on the Greater Noida Metro link underscores the commitment of authorities towards addressing the growing transportation needs of the rapidly expanding city. Once operational, the Metro link is poised to alleviate traffic congestion, reduce travel time, and enhance the overall quality of life for residents in Greater Noida.

Overall, the imminent acceleration of work on the Greater Noida Metro link holds promise for improving urban mobility and fostering sustainable development in the region. As construction activities pick up pace, the Metro link project is expected to emerge as a vital component of Greater Noida's transportation infrastructure, catering to the evolving needs of its populace.

Work on the Greater Noida Metro link is set to accelerate once the post-poll code is lifted, signaling a renewed push towards enhancing public transportation infrastructure in the region. This development comes as a positive sign for commuters and residents, as the Metro link project holds the promise of improving connectivity and easing travel woes in Greater Noida. With the impending lifting of the post-poll code, construction activities on the Metro link are expected to gain momentum, bringing the project closer to fruition. The Metro link is anticipated to provide a convenient and efficient mode of transportation for commuters, connecting key areas within Greater Noida and facilitating seamless travel across the region. The acceleration of work on the Greater Noida Metro link underscores the commitment of authorities towards addressing the growing transportation needs of the rapidly expanding city. Once operational, the Metro link is poised to alleviate traffic congestion, reduce travel time, and enhance the overall quality of life for residents in Greater Noida. Overall, the imminent acceleration of work on the Greater Noida Metro link holds promise for improving urban mobility and fostering sustainable development in the region. As construction activities pick up pace, the Metro link project is expected to emerge as a vital component of Greater Noida's transportation infrastructure, catering to the evolving needs of its populace.

Next Story
Infrastructure Urban

ClickPost Launches Atlas to Benchmark E-commerce Logistics

ClickPost, a leading logistics intelligence platform, has launched Atlas, a subscription-based benchmarking tool designed to transform how e-commerce brands strategise logistics. Powered by ClickPost’s proprietary network, which processes over 50 million shipments each month, Atlas enables brands to benchmark key operational metrics in real time against industry peers and standards.Unlike traditional dashboards, Atlas delivers comparative insights—from fulfilment speeds, RTO rates and average order values to city-level delivery times and sales data—allowing brands to identify operational..

Next Story
Real Estate

Kalyani Launches Two New LivingTree Towers in Bengaluru

Bengaluru-based Kalyani Developers has announced the launch of Towers 3 and 4 at its flagship residential project, Kalyani LivingTree, located in KIADB Aerospace Park. The expansion adds 525 premium 3BHK apartments, ranging from 1300 to 1600 sq ft, and over 7.5 lakh sq ft of built-up area. Prices start from Rs 1.2 crore.These towers, the most exclusive in Phase 1, offer uninterrupted pool and landscape views, and access to over 60 lifestyle amenities, two clubhouses totalling 1 lakh sq ft, and more than 80 per cent open space.LivingTree spans 25 acres and will comprise ten towers of 23–24 fl..

Next Story
Infrastructure Urban

Blue Water Logistics IPO opens May 27

Hyderabad-based Blue Water Logistics is launching its Rs 40.5 crore IPO on May 27, 2025, which will remain open for subscription until May 29. The price band has been set at Rs 132 to Rs 135 per share, with a lot size of 1,000 shares. This is a book-built issue entirely comprising a fresh issue of 30 lakh equity shares. The IPO will be listed on the NSE Emerge platform.Smart Horizon Capital Advisors is the sole book-running lead manager, while Maashitla Securities will act as the registrar. The anchor book will open on May 26, 2025. The IPO allocates 8,35,000 shares to anchor investors, 1,56,0..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?