City's emphasis on designated C&D waste collection sites
WATER & WASTE

City's emphasis on designated C&D waste collection sites

The Municipal Corporation of Delhi (MCD) announced its commitment to establishing dedicated construction and demolition (C&D) waste collection points, addressing the issue of illegal dumping, and educating citizens about responsible waste disposal.

To combat air pollution and manage C&D waste in the city, the civic body revealed that it had initiated proactive measures in collaboration with the Air Pollution Action Group (A-PAG).

It was stated that the primary focus involved the identification of key C&D waste collection points, prevention of illegal dumping, and imparting knowledge to citizens regarding responsible waste disposal.

The Corporation reported that it had pinpointed 49 strategic collection points across various zones, and an additional 35 setups were established to improve accessibility.

According to their statement, since October, 52,000 tonnes of debris had been collected at the designated storage areas, resulting in a significant 38 percent reduction in illegal dumping from October to November. To address the increasing waste disposal needs, new collection points were being established in Narela, Shahdara North, Shahdara South, and Rohini zones.

In an effort to raise awareness, information about C&D waste collection sites could be found on the MCD 311 app and the MCD website. These collection points were strategically located within a 2-3 km radius for the convenience of citizens. Emphasising citizen engagement, the civic body highlighted that they had conducted 213 meetings with resident welfare associations (RWAs) and provided compliance training to 180 waste transporters.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The Municipal Corporation of Delhi (MCD) announced its commitment to establishing dedicated construction and demolition (C&D) waste collection points, addressing the issue of illegal dumping, and educating citizens about responsible waste disposal. To combat air pollution and manage C&D waste in the city, the civic body revealed that it had initiated proactive measures in collaboration with the Air Pollution Action Group (A-PAG). It was stated that the primary focus involved the identification of key C&D waste collection points, prevention of illegal dumping, and imparting knowledge to citizens regarding responsible waste disposal. The Corporation reported that it had pinpointed 49 strategic collection points across various zones, and an additional 35 setups were established to improve accessibility. According to their statement, since October, 52,000 tonnes of debris had been collected at the designated storage areas, resulting in a significant 38 percent reduction in illegal dumping from October to November. To address the increasing waste disposal needs, new collection points were being established in Narela, Shahdara North, Shahdara South, and Rohini zones. In an effort to raise awareness, information about C&D waste collection sites could be found on the MCD 311 app and the MCD website. These collection points were strategically located within a 2-3 km radius for the convenience of citizens. Emphasising citizen engagement, the civic body highlighted that they had conducted 213 meetings with resident welfare associations (RWAs) and provided compliance training to 180 waste transporters.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement