Airstrips at Warangal, Peddapalli to developed under UDAN
AVIATION & AIRPORTS

Airstrips at Warangal, Peddapalli to developed under UDAN

Five years after the Ude Desh ka Aam Naagrik (UDAN) plan was launched, the Centre has proposed two airstrips in Telangana for the next round of the regional connectivity programme.

According to the Ministry of Civil Aviation, the Centre intends to connect 54 wildlife, religious, and tourism attractions as part of the next round of the UDAN scheme and will solicit bids by the end of 2022. Because of their proximity to tourist areas, non-operational airstrips in Warangal and Basanth Nagar (Peddapalli) are designated as possible airports under this scheme.

Earlier, the State proposed three greenfield and three brownfield airports and wrote several letters. The State had proposed to take up the development of three greenfield airports at Jakranpally (Nizamabad), Palvoncha (Bhadradri- Kothagudem) and Mahbubnagar, and three brownfield airports at Mamnoor, (Warangal), Basanth Nagar (Peddapalli) and Adilabad.

Also Read
Aviation industry to see losses of Rs 150-170 bn this fiscal
SAIL provides special DMR grade steel for INS Vikrant

Five years after the Ude Desh ka Aam Naagrik (UDAN) plan was launched, the Centre has proposed two airstrips in Telangana for the next round of the regional connectivity programme. According to the Ministry of Civil Aviation, the Centre intends to connect 54 wildlife, religious, and tourism attractions as part of the next round of the UDAN scheme and will solicit bids by the end of 2022. Because of their proximity to tourist areas, non-operational airstrips in Warangal and Basanth Nagar (Peddapalli) are designated as possible airports under this scheme. Earlier, the State proposed three greenfield and three brownfield airports and wrote several letters. The State had proposed to take up the development of three greenfield airports at Jakranpally (Nizamabad), Palvoncha (Bhadradri- Kothagudem) and Mahbubnagar, and three brownfield airports at Mamnoor, (Warangal), Basanth Nagar (Peddapalli) and Adilabad. Also Read Aviation industry to see losses of Rs 150-170 bn this fiscal SAIL provides special DMR grade steel for INS Vikrant

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?