+
Mumbai Metro Lines Four and Four A Set For Trial Runs Soon
RAILWAYS & METRO RAIL

Mumbai Metro Lines Four and Four A Set For Trial Runs Soon

The Mumbai Metropolitan Region Development Authority (MMRDA) is preparing to launch trial runs on a key 10-kilometre stretch spanning ten stations from Cadbury to Gaimukh on Metro Lines Four and Four A. These stations include Cadbury, Majiwada, Kapurbawadi, Manpada, Tikuji Ni Wadi, Dongripada, Vijay Garden, Kasarvadavli, Gownipada, and Gaimukh.

While the designated depot for Metro Lines Four and Four A is still under construction, the MMRDA has devised an interim plan involving inspection pits beyond the Gaimukh terminal to facilitate early testing.

Metro Line Four, which stretches 32.32 kilometres from Wadala to Kasarvadavali, is entirely elevated and includes 30 stations. It will connect seamlessly with major transport routes such as the Eastern Express Highway, Central Railway, Mono Rail, and future metro lines including Two B, Five, and Six. The line aims to reduce commute times by fifty to seventy-five per cent.

Metro Line Four A is a 2.7-kilometre extension from Kasarvadavali to Gaimukh, adding two stations and expanding metro access into the Thane region.

The MMRDA’s initiative to begin trials marks a major step towards improving Mumbai’s transit infrastructure and easing traffic congestion.

Source:Sweety Adimulam

The Mumbai Metropolitan Region Development Authority (MMRDA) is preparing to launch trial runs on a key 10-kilometre stretch spanning ten stations from Cadbury to Gaimukh on Metro Lines Four and Four A. These stations include Cadbury, Majiwada, Kapurbawadi, Manpada, Tikuji Ni Wadi, Dongripada, Vijay Garden, Kasarvadavli, Gownipada, and Gaimukh.While the designated depot for Metro Lines Four and Four A is still under construction, the MMRDA has devised an interim plan involving inspection pits beyond the Gaimukh terminal to facilitate early testing.Metro Line Four, which stretches 32.32 kilometres from Wadala to Kasarvadavali, is entirely elevated and includes 30 stations. It will connect seamlessly with major transport routes such as the Eastern Express Highway, Central Railway, Mono Rail, and future metro lines including Two B, Five, and Six. The line aims to reduce commute times by fifty to seventy-five per cent.Metro Line Four A is a 2.7-kilometre extension from Kasarvadavali to Gaimukh, adding two stations and expanding metro access into the Thane region.The MMRDA’s initiative to begin trials marks a major step towards improving Mumbai’s transit infrastructure and easing traffic congestion.Source:Sweety Adimulam

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code